Permit Number: T14CM00785
Parcel: 10513032D

Address:
4011 N 1ST AV L

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T14CM00785
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/14/2014 STEVE SHIELDS ZONING REVIEW Denied PDSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Shadow Pines Apartments
T14CM00785
Building Plan (1st Review)

TRANSMITTAL DATE: February 14, 2014

1. The building plans have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning has reviewed the building plans but cannot approve until a development package has been submitted and approved for the site changes

3. Provide a copy of the last approved site/development plan when submitting for development package review.

4. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
02/20/2014 MARTIN BROWN FIRE REVIEW Approved
02/25/2014 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. SHEET TS1; CODE ANALYSIS DATA: REMOVE THE 2010 EDITION OF THE ADA, AND REVISE THE ANSI TO THE 2009 EDITION.
2. SHEET ASP1.0; SITE PLAN: IN THE SOUTHEAST PORTION OF THE SITE (NEAR UNIT J80), THERE IS A REFERENCE TO NOTE 4.1 WHERE A WALL CROSSES THE SIDEWALK. SHOULD THIS BE D4.1? VERIFY.
3. SHEET A1.0; UNIT PLAN 3: A SECTION CUT AT THE NORTH END OF THE LIVING ROOM REFERENCES A5.0. COMPLETE THE REFERENCE.
4. SHEET A1.0 (ONE BEDROOM UNIT PLAN 3); SHEET A1.2 (DETAIL 7): IS THERE A BALCONY AT THE NORTH LIVING ROOM WALL PER DETAIL 7/A1.2? THE BALCONY IS NOT INDICATED ON THE PLAN 3.
5. SHEET A1.1; ONE BEDROOM UNIT PLAN 2: IN THE KITCHEN, TWO ELEVATIONS (4A/A1.1 AND 4B/A1.1) ARE INDICATED. REVISE THE ELEVATION REFERENCES.
6. SHEET A1.1; ONE BEDROOM UNIT PLAN 2: NOTE 4.1 IS INDICATED ON THE PLAN, BUT IS NOT LISTED IN THE KEY NOTES. VERIFY.
7. SHEET A1.1; ONE BEDROOM UNIT PLAN 2: KEY NOTE 16.2 WAS NOT LOCATED ON THE PLAN. VERIFY.
8. SHEET A1.1; ONE BEDROOM UNIT DEMOLITION PLAN 1: KEY NOTES D2.1, D6.1, AND D16.1 WERE NOT LOCATED ON THE PLAN. VERIFY.
9. SHEET A1.2; KEYPLAN: REMOVE THE NUMBER 4 IN THE TITLE REFERENCE.
10. SHEET A1.2; DEMOLITION KEY NOTES: NOTES D16.1 AND D16.2 WERE NOT LOCATED ON THE ELEVATIONS 4 AND 5. VERIFY.
11. SHEET A2.0; TWO BEDROOM UNIT PLAN 3: REMOVE THE ELEVATION REFERENCE 5/A2.1 FROM INSIDE THE DINING ROOM.
12. SHEET A2.1; DEMOLITION KEY NOTES: NOTE D16.2 WAS NOT LOCATED ON THE ELEVATION. VERIFY.
13. SHEET A2.1; ELEVATION KEY NOTES: NOTE 5.3 (AND DETAIL 2/A5.0) DESCRIBE A METAL CANOPY PER A MANUFACTURER. IS THIS A DEFERRED SUBMITTAL THAT SHOULD BE LISTED ON SHEET TS1? VERIFY.
14. SHEET A3.1; DEMOLITION KEY NOTES: NOTES D3.1 AND D16.2 WERE NOT LOCATED ON THE ELEVATIONS. VERIFY.
15. SHEET A4.0; COMMONS BUILDING PLAN 1: A DEMOLITION NOTE LOCATED IN THE RESTROOM REFERENCES D15.1. SHOULD THIS BE D15.2? VERIFY.
16. SHEET A4.0; PLAN KEY NOTES: NOTES 9.2, 9.3, 10.5, 10.6, AND 16.1 WERE NOT LOCATED ON THE PLAN. VERIFY.
17. SHEET A4.0; PARTITION TYPES: PROVIDE THE STUD SPACING AND STUD GAUGE, OR REFERENCE THE SPECIFICATIONS.
18. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
02/26/2014 CPIERCE1 WWM REVIEW Completed
03/06/2014 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Obtain an activity number for each separate building to facilitate inspection coordination in the field.
2. Detail 1/P3.1 is referenced for all hot water pipe sizes; is detail 3/P501 on sheet P3.1 misnamed?
03/06/2014 ROBERT SHERRY WATER REVIEW Approved
03/06/2014 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Obtain an activity number for each separate building to facilitate inspection coordination in the field.
2. Provide temperature and pressure relief valves for each section of the solar water heating system that can develop excessive temperatures or pressures beyond the design limitations. Reference: Section 1402.5.1, IMC 2012.
3. Show that the proposed natural gas-fired hot water boiler meets the thermal efficiency requirements of Table C403.2.3 (5), IECC 2012. Reference: Section C403.2.3, International Energy Conservation Code 2012.
03/07/2014 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
05/27/2014 CPIERCE1 REJECT SHELF Completed