| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/29/2014 | IMEDINA1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
| 01/29/2014 | IMEDINA1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
| 01/29/2014 | IMEDINA1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
| 01/29/2014 | IMEDINA1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
| 01/29/2014 | IMEDINA1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
| 01/29/2014 | IMEDINA1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
| 01/29/2014 | IMEDINA1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
| 01/29/2014 | IMEDINA1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
| 01/29/2014 | IMEDINA1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
| 01/30/2014 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | PIA: I-2013-020 ACTIVITY NUMBER: T13PI00027 PROJECT NAME: Meridian i-19 Access (ADOT gated driveway) PROJECT ADDRESS: 34th St. & Fiandaca Rd. PROJECT REVIEWER: Matthew Geweke, Traffic Eng. Tech Non-Acceptance: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is necessarily for re-submittal. The following items must be revised or added to the plan. Please include a brief response letter with the next submittal that states how all comments have been addressed and the original redlined sets of plans for back checking. - Sht. 1: Okay, yes this is within City Limits, sorry I obviously did not clearly explain the intent of what information/definitions that I was asking for. ADOT zealously defends their jurisdictional property lines and right of way, so… since this additional ROW is going to be dedicated over to the City of Tucson, and this is going to be a COT/PIA as per the information provided on the plans, Traffic Eng will treat this as COT/PIA Signing & Striping, and will proceed forward and treat it as such. Please do make sure ADOT has given more than their tacit approval - any future ROW Striping & Signing concerns from ADOT will be referred back to your office. - Sht. 3 Sta. 2+85: since you now call out the R1-1 STOP sign, please add the D3-1 as redlined. The three OM4-3 are shown but not called out, nor is the "Single Arrow" W1-6R and "NPAT" R3-8a. -Sht. 4 Please make a keynote for the OM4-3, R8-3, W1-6R & W1-1R signs. Please place the W1-6R on the center post and the NPAT on either one of both of the end posts. If you wish to email me at Matthew.Geweke@tucsonaz.gov the PDF of redlines and corrected Shts with the revisions of these requested changes, we could expedite the Traffic Eng. acceptance/approval of these plans. I can also be reached at 837-76665 with any questions. Thank you Matthew Geweke |
| 02/03/2014 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
| 02/18/2014 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approv-Cond | February 14, 2014 SUBJECT: Public Paving Plans for Fiandaca Blvd. and 34th St - Meridian I-19 Access 2nd Review PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and recommends a conditional approval. The following comments need to be addressed prior to in the subsequent review submittal. Please return redlined drawings with next submittal. 1. Provide truncated domes in asphalt pathway at the roadway intersections. 2. Provide horizontal and vertical control for asphalt path. 3. Sufficient right-of-way will need to be provided to accommodate asphalt path embankment. 4. Address comments on redline plan set. Responses can be noted on redline drawings. 5. Show proposed right-of-way limits include placeholders for recordation information. Please Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
| 02/19/2014 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
| 05/29/2014 | LINZUNZA | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
| 05/29/2014 | LINZUNZA | PIA COORDINATOR | OUT TO CUSTOMER | Completed |