Address Search: 901 W 34TH ST
Search
Parcel Attributes
| Parcel | 11811049J |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | P-I, I-1 |
| Tucson Ward | Ward 1 |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 901 W 34TH ST
Date - 05/24/2026 9:19 p.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 05/24/2026 9:19 p.m.
Total Number Of Rezone Cases - (2)
Permits
Address: 901 W 34TH ST
Date - 05/24/2026 9:19 p.m.
Total Number Of Permits - (10)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-1222-00392 | Withdrawn | 12/30/2022 | 06/28/2023 | Commercial Building | (CE-VIO1222-00946) Install temporary 3 phase 200amp service | |
| TZ-PMT-1125-00107 | Void | 11/05/2025 | N/A | Zoning Permit Annual | **VOID - REFER TO TZ-PMT-0126-00008** The property is zoned industrial and is being used as a temporary construction yard until the new Meridian Construction headquarters in constructed on the property. | |
| TC-UTL-1025-00092 | Expired | 10/13/2025 | N/A | Utilities Permit | Fiandaca Boulevard Development -Phase 1 | |
| TD-DEV-0923-00398 | Issued | 09/19/2023 | 09/18/2024 | Development Package | Fiandaca Boulevard Development -Phase 1 | |
| TZ-PMT-0623-00074 | Needs Resubmittal | 06/29/2023 | N/A | Zoning Permit Annual | The property is zoned industrial and is being used as a temporary construction yard until the new Meridian Construction headquarters in constructed on the property. | |
| TW-DEVCON-0526-0037 | Submitted | 05/18/2026 | N/A | TW New Area Development | Santa Cruz Lane Development - Transferred to construction. | |
| TR-PIA-0424-00006 | Approved | 04/12/2024 | N/A | Private Improvement Agreement (PIA) | Sidewalk improvements and widening of 34th Street | |
| T22CM01394 | Void | 02/25/2022 | N/A | Commercial Building | Temporary power pedestal for land development and security. | |
| TZ-PMT-0126-00008 | Issued | 01/27/2026 | 02/05/2027 | Zoning Permit Annual | Fiandaca Boulevard Development -Phase 1 | |
| T01AN01028 | ISSUED | 10/30/2001 | N/A | ADDRNEW |
Code Enforcement
Address: 901 W 34TH ST
Date - 05/24/2026 9:19 p.m.
Total Number Of Code Cases - (2)
| Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO1222-00946 | Active | 12/14/2022 | CWOP/ZCOM: Vacant lot now has storage of metal containers, large commercial vehicles and equipment. SW section of parcel has been graded and grubbed of vegetation, along with stockpiling of dirt or gravel. New wall along west PL in this area. Refuse and Weeds. No Development Plan on file; requires DP and permits. There is also rezoning conditions from 2013 that are required (attached), including archaeological surveys before grading, etc. that the current development likely does not meet. | |||
| CE-VIO0526-02182 | Received | 05/19/2026 | CTOR/ storing junk |
Plans
Address: 901 W 34TH ST
Date - 05/24/2026 9:19 p.m.
Total Number Of Plans - (11)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T22PRE0167 | Submitted | 07/28/2022 | N/A | -- Pre-Application Conference | Special Exception pre submittal meeting August 17, @ 9:30am - 80' multi carrier cell tower with 40' x 40' communication compound | |
| TE-BAS-0524-00046 | In Review | 05/08/2024 | N/A | -- Stormwater Basin | Retention/Detention Basin | |
| TP-MOD-0923-000023 | Approved | 09/08/2023 | 03/06/2024 | -- Modifications to Previous Zoning Approvals | Revised PDP to show revised site concept | |
| C9-09-03 | EFFECTED | 02/03/2009 | N/A | REZONING PROCEDURES -- REZONE | A request to rezone 21.0 acres from R-1 to P-I and 6.0 acres from R-1 to I-1 to allow office, contractors yard, light manufacturing, research and development and other light industrial or park industrial uses. | |
| T07PRE0001 | APPLIED | 01/04/2007 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | ||
| T07PRE0097 | APPLIED | 12/04/2007 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | Proposed asphalt plant, concrete batch plant, tire & shingle processing plant, construction debris crusher and green-waste recycler. | |
| T08PRE0019 | APPLIED | 02/20/2008 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | primary manufacturing, contractors yard, equipment storage & office. | |
| T10PRE0004 | APPLIED | 01/14/2010 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | Request for neighborhood meeting labels to discuss revision to rezoning request C9-09-03. | |
| T13PI00027 | FINAL | 12/06/2013 | 08/22/2020 | PAVING -- 205 | MERIDAN I-19 ACCESS Offsite Improvement plans for the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on City of Tucson approved plan I-2013-020 (all in accordance with Pima County/City of Tucson Standards and Specifications and Details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson Standards and Specifications. Any required special inspection shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson Department of Transportation, Permits and Codes Section, for review prior to start of construction. | |
| T13PRE0042 | CLOSED | 06/07/2013 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | ||
| T19PRE0059 | CLOSED | 04/02/2019 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | PLAT - MERIDIAN PARCEL, 18 LOTS |