Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T13CM06873
Parcel: 12314138A

Address:
1730 N 1ST AV

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM06873
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/03/2014 LOREN MAKUS ENGINEERING REVIEW Approved Restamped 14FEB14 - change in plans to include additonal on site sidewalk besides TI work.
02/24/2014 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide water supply isometrics. Reference: Section 107.2.1, IBC 2012.
2. Section 604.1, IPC 2012 allows water distribution systems to be designed using accepted engineering methods. Identify the method being used to determine the sizes for the water distribution. For the use of PEX tubing, provide a branch tube sizing chart showing the correct size of PEX tubing to be used as a substitute for the copper pipe shown on the drawings. Reference: Sections 303.2 and 604.3, IPC 2012.
3. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, recirculation pump, and valves. Reference: Sections 502.1, 503.1, 503.2, 504, 606.1, and 607.3 IPC 2012.
4. Provide a full-open valve for the water service at the building entrance. Reference: Section 606.1(2), IPC 2012.
5. The developed length of the hot water supply piping appears to be greater than fifty feet; provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2012.
6. Provide cleanouts for all horizontal drains; the cleanouts shall be sized per Section 708.7, IPC 2012 and shall open to allow cleaning in the direction of flow. Reference: Sections 708.3.1 and 708.5, IPC 2012.
7. Provide the rim elevation of the next upstream sanitary manhole and the first floor elevation for each building. Determine the need for a backwater valve per Section 715.1, IPC 2012, as amended by the City of Tucson.
8. Provide vents for the showers in building #2. Reference: Section 912.1, IPC 2012.
02/24/2014 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide mechanical ventilation for the two buildings. Reference: Sections 40R402.4.1.2 and R403.5, IECC 2012.
2. Revise the HVAC load calculations to use the approved design temperature conditions. Reference: Section R302.2, IECC 2012, as amended by the City of Tucson.
3. Complete the load calculations and include the Manual S equipment sizing calculations.
4. Show that the buildings meet the requirements of the 2012 International Energy Conservation Code (e.g. provide COMcheck).
02/24/2014 ROBERT SHERRY WATER REVIEW Approved
02/26/2014 RONALD BROWN BUILDING-COMMERCIAL REVIEW Reqs Change 1. Needs architects seal on all drawings.
2. Provide code analysis for type A and B units and verify conformance with code.
3. Show window exiting requirements on drawings, size and sill height.
4. Provide a DP application for revised site plan. Include all accessible codev requirements.
5. Need project valuation.
END OF REVIEW
02/26/2014 RONALD BROWN COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
03/13/2014 SPOWELL1 WWM REVIEW Needs Review
03/13/2014 SPOWELL1 ELECTRICAL-COMMERCIAL REVIEW Needs Review
03/13/2014 SPOWELL1 ZONING REVIEW Needs Review
03/13/2014 SPOWELL1 FIRE REVIEW Needs Review