Review Details: COMMERCIAL - TI
Permit Number - T13CM05040
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/16/2013 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
08/16/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Verify the termination point of the overflow roof drains. Condensate drains may not terminate over a roof drain unless the roof drain itself terminates at or above grade in an area capable of absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2012, as amended by the City of Tucson. 2. Revise plans as required to provide a separation of at least ten feet between air intake openings and exhaust openings. Reference: 401.4 (2), IMC 2012. |
08/16/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
08/16/2013 | ROBERT SHERRY | WATER | REVIEW | Approved | |
08/16/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
08/16/2013 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approved | |
08/16/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | An approved 2-way cleanout fitting is allowed to be used at the junction of a building drain and a building sewer; otherwise, cleanouts shall open to allow cleaning in the direction of flow (see detail E13/P100). Reference: Sections 708.3.5 and 708.5, IPC 2012. |
08/16/2013 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
08/19/2013 | KEN BROUILLETTE | FIRE | REVIEW | Approved | |
08/29/2013 | FRODRIG2 | WWM | REVIEW | Passed |