Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T13CM03807
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/08/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T13CM03807 1540 E Glenn Salpointe School , 70 KV PV System 1. Per City of Tucson Submittal Requirements show locations on plans for following items, SES, AC (PV) disconnect, DG meter, inverter, recombiner, combiner boxes and combiner disconnects. 2. Provide fault current values at SES and for new equipment per NEC 2011,110.9, 690.14.A, and 16, also per 705.14 and 16. 3. Is the existing SES approved for a line side termination in that are there pre drilled holes in the bussing or are existing terminals provided ? Is room available in line side cubicle for conductors ? This installation may require a third party certification on changes to the existing SES (NEC 110.3) 4. A three line diagram is required as well as the one line submitted. 5. Describe intention of the junction box next to SES. How will it be attached to the SES and connection be made weather-proof ? If box has a removeable cover can it be locked ? 6. Are the Polaris connectors to be used in the junction box listed for the AIC at the SES ? Provide a spec sheet if listed. Ray T Majuta Elect Plan Review PDSD, Tucson 7/9/2013 Ray.Majuta@tucsonaz.gov 520/837/4988 |
| 07/10/2013 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Please provide details and sections of the existing shade structure and PV panel connections. 2. Please provide Inverter structural details on the drawings, foundation and cabinet connections. 3. Please provide certification of the required special inspectors as outlined on sheet S1. END OF REVIEW |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/14/2013 | CPIERCE1 | REJECT SHELF | Completed |