Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T13CM03780
Parcel: 11615077C

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM03780
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/25/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
06/25/2013 KEN BROUILLETTE FIRE REVIEW Approved
06/26/2013 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET CS1; BUILDING CODE SUMMARY: REVISE THE ACCESSIBILITY CODE TO THE ICC/ANSI A117.1-2009 EDITION.
2. SHEET A1; DRINKING FOUNTAIN ELEVATION D: PER THE INTERNATIONAL PLUMBING CODE SECTION 410.2, A HIGH/LOW DRINKING FOUNTAIN IS REQUIRED. AS AN ALTERNATIVE, THE CITY OF TUCSON ALLOWS A SINGLE POINT-OF-USE WATER DISPENSER IN LIEU OF THE HIGH/LOW FOUNTAIN. REVISE THE ELEVATION. THIS COULD BE PART OF THE 20% ACCESSIBILITY UPGRADE AS DESCRIBED IN NOTE 6 OF THESE COMMENTS.
3. SHEET A1; FLOOR PLAN: EXIT SIGNS MUST BE CLEARLY INDICATED AT THE INTERIOR WALL (SHOWN ON ELEVATION C/A3.1) FOR THE EXTERIOR EXIT ON THE SOUTH BUILDING WALL (SINGLE AND DOUBLE DOOR). VERIFY.
4. SHEET A4; SECTIONS 3, 7, AND 8: INCLUDE IN THE BOXED NOTE FOR THE GONDOLA FIXTURE UNITS TO SEE SHEETS SA1.1 AND SA2.1 FOR GONDOLA RACK LOCATIONS AND DETAILS.
5. GENERAL: PROVIDE TWO SETS OF STRUCTURAL CALCULATIONS.
6. GENERAL: PROVIDE A NOTE ON THE DRAWINGS INDICATING THE % OF THE COSTS FOR ACCESSIBILITY ISSUES IN REFERENCE TO THE TOTAL COST OF THE PROJECT. THE CITY OF TUCSON REQUIRES A MAXIMUM OF 20% OF THE TOTAL COSTS FOR ACCESSIBILITY UPGRADES. THIS MIGHT INCLUDE ACCESSIBILITY TO THE FACILITY, ACCESSIBILITY INTO THE FACILITY, HIGH/LOW DRINKING FOUNTAIN (OR SINGLE POINT-OF-USE DISPENSER), OR OTHER ACCESSIBILITY FEATURES IN THE BUILDING.
7. GENERAL: THE CITY OF TUCSON REQUIRES A SEPARATE PERMIT FOR NEW RACKING AND SHELVING. THIS PERMIT CAN USE THE DRAWINGS AND CALCULATIONS INCLUDED IN THIS REVIEW.
8. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. NO ADDITIONAL REVIEWS WILL BE PERFORMED WITHOUT THOSE RESPONSES.
06/27/2013 ROBERT SHERRY WATER REVIEW Approved
06/27/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. The specified temperature mixing valve does conform to ASSE 1070 but per the manufacturer, it is designed to only supply individual outlets. A temperature mixing valve conforming to ASSE 1017 may be installed if desired but each lavatory will still require the installation of a mixing valve conforming to ASSE 1070. Reference: Sections 303.2 and 416.5, IPC 2012.
2. Provide insulation for the first eight feet of piping at the water heater (both hot and cold water) per Section C404.5, IECC 2012.
3. Clarify the extent of the plumbing work to be done; for example where will the specified floor drain be installed? Reference: Section 107.2.1, IBC.
06/27/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restrooms will be exhausted The exhausted air from the restrooms shall be limited to no more than 10% of any subsequent supply air stream. Reference: Section 403.2.1 (4), IMC 2012.

Final Status

Task End Date Reviewer's Name Type of Review Description
07/05/2013 AROMERO4 OUT TO CUSTOMER Completed
07/05/2013 CPIERCE1 REJECT SHELF Completed