Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T13CM02748
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/03/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
10/15/2013 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
10/22/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Sheet P103 shows a 4" roof drain leader and a 4"overflow roof drain leader, each serving 3200 square feet of roof, running horizontally with a slope of 1/8" per foot. Per Table 1106.3, IPC 2012, the maximum capacity of a 4" pipe with a slope of 1/8" per foot is 2506 square feet. |
10/22/2013 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Verify that the equivalent lengths of the dryer exhaust ducts located in room types X12, X12.1, and X12.2 are less than 35 feet. If the equivalent duct lengths exceed 35 feet, provide the dryer manufacturer's installation instructions for review. Reference: Sections 504.6.4.1, 504.6.4.2, and 504.6.5, IMC 2012. |
10/28/2013 | MARTIN BROWN | FIRE | REVIEW | Approv-Cond | THE BUILDING WILL BE REQUIRED WITH ALL HIGH-RISE REQUIREMENTS FROM THE IFC AND IBC 2012 EDITIONS. ALL APPROVALS ARE SUBJECT TO FIRE INSPECTOR APPROVAL. CONTRACTOR SHALL COMPLY WITH IFC CHAPTER 33 DURING CONSTRUCTION |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/18/2013 | CPIERCE1 | OUT TO CUSTOMER | Completed |
11/18/2013 | CPIERCE1 | REJECT SHELF | Completed |