Permit Number: T13CM01691
Parcel: 11310001A

Address:
1545 E COPPER ST

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T13CM01691
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/29/2013 MARTIN BROWN FIRE REVIEW Approved
04/01/2013 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied SHEET A0
1. General Building Summary:
a. Under catagory BUILDING please show the art work room as a new addition and not as existing space.
b. Show the square footage (+/- 905) for this addition
c. Exiting required is 2, not existing
d. The occupancy statistics is incorrect. Please show the correct occupancy load as 1/50 s.f. or +/- 18.
2. Scope of Work: As per section 1004, Table 1004.1.2, eduactional shops and other vacational rooms require 1 person for every 50 s.f. Therefore, the occupancy load, as per the 2012 IBC, does not remain the same but increases by +/- 18 occupants. Please show this increase on the drawings.
SHEET A1.0
3. At note 22, please insure panic hardware as required by the 2012 IBC, section 1008.1.10.
4. Insure exit signs are indicated on sheet E1.0 for the required exits.
SHEET S1.1
5. Please provide certification of special inspectors as outlined on this sheet.
6. Provide structural details and calculations for the new suspended fan coil units shown on the mechanical drawings.
7. Insure accessibility access from the existing art room to the level of the new art room addition.
END OF REVIEW
04/01/2013 RONALD BROWN COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
04/08/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide the complete drawing set for the plumbing (e.g. details, water pipe sizing calculations, plumbing schedule, and the fixture schedule. Reference: Section 107.2.1, IBC 2012.
2. Verify that all of the vents rise vertically to at least 6" above the flood rims of the fixtures they protect prior to running horizontally. Reference: Section 905.4, IPC 2012.
04/08/2013 ROBERT SHERRY WATER REVIEW Denied Provide sufficient information to show that the installation of the new plumbing fixtures will not cause the existing water service (i.e. water meter and RPBP) to become overloaded. Reference: Section 107.2.1, IBC 2012.
04/08/2013 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied T13CM01691
1545 E Copper
Salpointe School Remodel

1. Sheet E2.0, Key Note #6 the location of equipment, is this
area outdoors ? Plan not clear . If outdoors the Power Center #4A Switchgear is listed with a Nema 1 rating on Sheet
E4.0 ? Clarify location.
2. Sheet E2.0, in area of Key Note #6, name electrical equipment on plan ( transformers, switchboard etc).
3. Sheet E2.1, Power Plans show one CU 4 and CU 5. The equipment schedule and panel schedules show CU 4a and 4b, also CU 5a and 5b. I understand the "b" unit are to be future ?
4. Sheet E1.0 lighting in rooms do not have exit or emergency lighting ?
5. Sheet E4.0, one line diagram shows feeds from Power
Center #4A Switchgear to the individual transformers then to the disconnects, the disconnects show a line to the panels, also the tranformers feed the panels. The disconnects are labeled 277/480v, however Sheet E2.0
Key Note 5 indicates disconnects to be on secondary of transformers (120/208v) ?
6. Sheet E4.0 has Panel 4WD1 two feeders which go to two different panels both named 4W3 ?
7. Sheet E4.0, what does the line between the 277/480v disconnects and the 120/208v panels indicate ?
8. Sheet E5.0, panel 4W2 circuits 1.3.5,7,9, 40,42- not on plan , if existing indicate on schedule.
9. Sheet E6.0, the system grounding detail indicates the grounding conductor to tie to concrete encased ufer, where and how ? The ground rods are also shown and tied to Power Center #4A, how does this comply with 250.58, which requires system grounding of new and existing services to be tied together ? Existing systems being the feed to the structure now.

Provide a response sheet indicating how items have been
addressed.

Ray T Majuta
Elect Plan Review
DSD, Tucson
4/9/2013
Ray.Majuta@tucsonaz.gov
04/09/2013 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide the mechanical energy code compliance certification for the installation of the new mechanical equipment. Reference: Section C303.1, International Energy Conservation Code 2012.
2. Show that each HVAC zone being revised has a thermostatic control that provides for off-hour and set-back control, automatic shutdown and start-up control and, if the control does not require manual changeover from the heating and cooling modes, restricts set point overlap. Reference: Sections C403.2.4.1, C403.2.4.2, C403.2.4.3, C403.2.4.3, C403.2.4.3.1, C403.2.4.3.2, and C403.2.4.3.3, IECC 2012.
04/10/2013 CPIERCE1 WWM REVIEW Needs Review