Permit Number: T12OT00959
Parcel: 11516019S

Address:
1365 W GRANT RD

Review Status: Active

Review Details: FLOODPLAIN

Permit Number - T12OT00959
Review Name: FLOODPLAIN
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
07/20/2012 ELIZABETH LEIBOLD ENGINEERING REVIEW Approved July 24, 2012
FLOODPLAIN USE PERMIT # T12OT00959
PROJECT ADDRESS: 1365 W Grant Rd, Tucson Arizona 85705
APPLICANT'S NAME: LightDay Solar, Inc
PROPERTY OWNER: PARK MU GIL & OAK MAI & PARK GEANIE Y & PARK KEVIN S ALL JT/RS

The applicant is authorized to use a portion of City of Tucson FEMA flood area, specifically described as:
On Parcel: 115-16-019S of SELY CNTRL PTN NW4 NW4 1.99 AC SEC 2-14-13, located at 1365 W Grant Rd, Tucson Arizona 85745, FIRM panel 2276L, within T14S R13E Sec.2;
for the purpose of photovoltaic improvements to an existing commercial structure in a FEMA 100-year floodplain.
The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard Area Regulations, and is bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations require application for, review and approval of an additional Floodplain Use Permit.
This floodplain use permit is issued with the following 13 conditions:
1) This project is located in Zone X-shaded 100-year zone as shown on LOMR 10-09-2016P effective date 28NOV11 as determined by the City of Tucson. This PV solar roof improvement is impacted by the FEMA 100-year floodplain.
2) To assess cumulative substantial improvement, cost estimate ($7,500) was provided showing that the improvements are less than 50 % (estimate for T12OT00959 is 14.8%) indicating a cumulative total percentage of 14.8% of the assessed value of the structure ($331,820.00 excluding land value), as shown on Pima County Assessor Property Inquiry. No person shall repair or alter property in a piecemeal manner so as to avoid the provisions of Section 26-4.1.a.3, Chapter 26-Tucson Code. The estimate will be recorded and any future improvements will be added to it.
Estimated cost of improvement (construction) = $7,500.00
Assessed value (2012) of the existing improvements
(i.e. structure), excluding the value of the land = $331,820.00
The percentage of improvements to the existing structure:
$7,500 / $331,820 = 2.2%
3) This Floodplain Use Permit T12OT00959 is issued concurrently with the associated improvement plans/permit T12CM02660. Copies of these documents shall be kept in a readily accessible location on site at all times.
4) Any associated utility box panels at the side of building shall be elevated with 3 feet below utility box and the adjacent ground.
5) All work shall conform to the attached plans which are made part of this permit. The applicant attests to the fact that the plans and documents submitted represent all of the improvements that will be done to the existing building, and that all additions, improvements or repairs to the building are included in the construction plans and/or documents herewith. No other improvements, repairs, reconstruction, additions or remodeling have been made to the structure that is not indicated in the attached plans and/or documents. This permit is specific to the improvements for the building specified as indicated on the approved plans. It shall not apply to any other structure or property, whether attached or unattached, not specified under this permit.
6) Within 5 (five) days of issuance of this permit, and continuing through to the completion of the project, notification must be posted and maintained in a conspicuous place on the job site stating "Construction proceeding under requirements of City of Tucson Floodplain Use Permit No.T12OT00959. For information please call 791-5550."
7) The proposed improvements shall not impose conditions that would increase the flood damage potential to the combined proposed and existing building, by greater than 50 percent of the existing structure's value.
8) All future improvements will be cumulative in percentage, to include this project. When the cumulative improvements equal or exceed 50% of the current value of the structure; no other improvements will be permitted unless the entire structure is brought into compliance with the City of Tucson Floodplain and Erosion Hazard Area Regulations (Chapter 26, Tucson Code). If the project is determined to be a substantial improvement, and, if it is determined that the lowest flood elevation is below the regulatory floor elevation, a design submittal, and review and acceptance of the submittal for flood regulation compliance will be required and shall conform to current City of Tucson floodplain development requirements in effect on the date of authorization by the Planning & Development Services Department.
9) For future improvements to this structure, a qualified appraisal shall be provided to Planning & Development Services Department - Engineering Division. The appraisal shall serve as documentation, as required, demonstrating that the value of the future improvements to this structure is less than 50% of the current value of the total appraised/assessed value of the existing structure, not including the land. An application / processing / submittal fee (and if applicable, any review fees) must accompany each future request for work to be authorized for this building structure. Engineering study review fees may be imposed based upon the fee schedule in the current floodplain ordinance. It shall be the responsibility of the owner to supply the following for all work to be authorized for future improvements:
" An 8-1/2" x 11" map locating improvement on this parcel
" Description of improvement
" Provide permit activity number(s)
" Title of improvement
" Type of assessment used for valuation
" Cumulative value of the building structure
" Value of improvement in U. S. Dollars
" A calculated percent improvement
10) Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties. The existing drainage patterns at the property lines shall not be obstructed nor changed.
11) This permit becomes invalid and is subject to additional floodplain review, if any required development permit changes the configuration of the structure and or site development.
12) This permit expires July 24, 2013. If extension is not requested prior to expiration date, renewal of this permit will require a new application, review and approval of that application by the City of Tucson, Planning & Development Services Department, Engineering Division. This permit may be renewed for up to one year, at the sole discretion of the City Engineer or designated representatives.
13) See also T12CM02660.

In reviewing this Floodplain Use Permit application for improvements to an existing floodprone structure, it has been concluded that the cumulative value of improvements to this structure, as supported by documentation provided by the applicant, is less than 50% of the current value of the existing structure. This Floodplain Use Permit will be automatically revoked and becomes invalid if conditions are not complied with, as set forth in this permit.
CONTRACTOR / APPLICANT: LightDay Solar Inc
ADDRESS: 5861 S Kyrene Rd
PHONE: (480) 921-3977
(EXPIRATION DATE) Month: July Day: 24 Year: 2013

SIGNATURE OF APPLICANT DATE
The applicant is authorized by the City Engineer to receive a floodplain use permit subject to the above referenced conditions and restrictions.

Final Status

Task End Date Reviewer's Name Type of Review Description
07/28/2012 ANY APPROVAL SHELF RECEIVED