Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM07950
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/03/2013 | KEN BROUILLETTE | FIRE | REVIEW | Approv-Cond | NO OCCUPANCY OF BUILDING ALLOWED WITH THIS PERMIT. SHELL ONLY. EXITING WILL BE ADDRESSED ON TENANT IMPROVEMENT PLANS. |
01/10/2013 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEETS a1.0, a1.1, AND a1.2: THIS PROJECT IS FOR SHELL IMPROVEMENTS ONLY. A SEPARATE PERMIT FOR A TENANT IMPROVEMENT OF EACH SPACE WILL BE REQUIRED, INCLUDING A CODE ANALYSIS, FIRE REQUIREMENTS, EGRESS AND EXITING, OCCUPANCY LOAD, PLUMBING REQUIREMENTS, AND A NEW DRAWING PACKAGE. 2. SHEETS a2.1 AND a3.1; DEMOLITION KEYNOTES: A NOTE INDICATES TO SEE DEMOLITION SHEETS a2.0 AND a2.1 FOR ALL KEYNOTE LOCATIONS. REVISE THE a2.0 SHEET REFERENCE (SHEET a3.1). VERIFY. 3. SHEETS a2.1 AND a3.1; DEMOLITION KEYNOTES: KEYNOTES 10 AND 11 WERE NOT LOCATED ON THE PLANS. VERIFY. 4. SHEET a2.2; GENERAL NOTES: MOVE THE 'GENERAL NOTES' TITLE (INTERFERES WITH THE FURRING NOTE). 5. SHEET a2.2; TENANT NOTES: ADD NOTES AS REQUIRED. 6. SHEET a2.2 (FLOOR PLAN); KEY NOTES: KEY NOTE 21 (LOCATED AT THE NORTHEAST CORNER OF THE BUILDING) IS NOT IN THE CORRECT LOCATION. VERIFY. 7. SHEET a2.2 (FLOOR PLAN); KEY NOTES: KEY NOTE 35 (LOCATED NORTH OF THE BUILDING BETWEEN GRIDS 7 AND 8) IS NOT IN THE CORRECT LOCATION. VERIFY. 8. SHEET a2.2 (FLOOR PLAN); KEY NOTES: KEY NOTE 34 (LOCATED NORTH OF THE BUILDING BETWEEN GRIDS 5 AND 6 AND GRIDS 4 AND 5) IS NOT IN THE CORRECT LOCATION. VERIFY. 9. SHEETS a2.2 AND a3.2; KEY NOTES: KEY NOTES 2, 4, 6, 44, AND 46 WERE NOT LOCATED ON THE PLANS. VERIFY. ADD A NOTE ON THESE SHEETS TO REFERENCE SHEETS a2.2 AND a3.2 FOR COMBINED KEY NOTES. 10. SHEETS a2.3 AND a3.3; KEY NOTES: KEY NOTES 4 AND 8 WERE NOT LOCATED ON THE PLANS. VERIFY. ADD A NOTE ON THESE SHEETS TO REFERENCE SHEETS a2.3 AND a3.3 FOR COMBINED KEY NOTES. 11. SHEET a2.4 (SIDEWALK PLAN); KEY NOTES: KEY NOTE 35 (LOCATED NORTH OF THE BUILDING AT THE 'CONGRESS STREET' DESIGNATION) IS NOT CORRECT (NO KEY NOTE 35). REVISE. 12. SHEET a2.4; KEY NOTES: KEY NOTES 4 AND 18 WERE NOT LOCATED ON THE PLAN. VERIFY. 13. SHEET a3.2; GENERAL NOTES: MOVE THE 'GENERAL NOTES' TITLE (INTERFERES WITH THE FURRING NOTE). 14. SHEET a3.2; TENANT NOTES: ADD NOTES AS REQUIRED. 15. SHEETS a6.0, a6.1, a7.0, AND a7.1; KEY NOTES: KEY NOTES 6, 13, 14, 15, 16, 18, 19, 20, 22, 23, 26, 35, 39, AND 41 WERE NOT LOCATED ON THE ELEVATIONS/SECTIONS. VERIFY. ADD A NOTE ON THESE SHEETS TO REFERENCE SHEETS a6.0, a6.1, a7.0, AND a7.1 FOR COMBINED KEY NOTES. 16. SHEET a7.1; SECTION 3: KEY NOTE 80 (LOCATED LEFT OF GRID d) IS NOT CORRECT (NO KEY NOTE 80). REVISE. 17. SHEETS a8.0, a8.1, a8.2, AND a8.3; KEY NOTES: KEY NOTE 18 WAS NOT LOCATED ON THE ELEVATION/SECTIONS. VERIFY. ADD A NOTE ON THESE SHEETS TO REFERENCE SHEETS a8.0, a8.1, a8.2, AND a8.3 FOR COMBINED KEY NOTES. 18. SHEET a9.1; DETAIL 25: PROVIDE THE METAL STUD SPACING. 19. SHEET s2.1; SHEAR WALL SCHEDULE: WHERE ARE THESE SHEAR WALLS SHOWN ON THE PLAN? VERIFY. 20. SHEET s2.1; FOUNDATION PLAN NOTES: NOTE 2 WAS NOT LOCATED ON THE PLAN. VERIFY. 21. SHEET s4.1: PUT A NOTE ON THIS SHEET TO REFERENCE SHEET s3.1 FOR THE BEAM SCHEDULE. 22. GENERAL: PROVIDE TWO SETS OF STRUCTURAL CALCULATIONS. 23. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
01/16/2013 | LEERAY HANLY | MECHANICAL-COMMERCIAL | REVIEW | Denied | |
01/16/2013 | LEERAY HANLY | PLUMBING-COMMERCIAL | REVIEW | Denied | |
01/18/2013 | ROBERT SHERRY | WATER | REVIEW | Denied | The water calculations shown on sheet P3.5 indicate that five tenants will have a water demand of 40 GPM each. Sheet P1.1, however, shows that only three 1" water meters are being installed to serve these tenants. First, Tucson Water limits a 1" meter to a maximum demand of 37.5 GPM: provide a letter from Tucson Water confirming that the use of a 1" water meter will be allowed for this project. Second, show the location of the additional two water meters that need to be installed to match the water calculations or revise the water calculations to show how the tenants' water demand will be accommodated. Reference: Sections 610.2 and 610.12, UPC 2006. |
01/29/2013 | GERRY KOZIOL | WWM | REVIEW | Needs Review | |
12/19/2012 | TERRY STEVENS | ZONING | REVIEW | Denied | Zoning cannot approve the building plan until a Development Package has been submitted and approved. |
12/21/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T12cm07950 300 E Congress 1. The first 1200 amp service is only fed by parallel (2) , 4-500MCM-THWN (AL) = 620 amps ? 2. The Fault Current Note on Sheet E5.0, does it mean the panels as well as the circuit breakers, please clearify. Ray T Majuta Elect Plan Review PDSD, C of Tuc 12/21/2012 |
12/27/2012 | LOREN MAKUS | ENGINEERING | REVIEW | Approved |