Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel11706168A
117061680
JurisdictionTucson
City of Tucson ZoningOCR-2
Tucson WardWard 6
Tucson Downtown Incentive ZoneDowntown Core, Downtown Infill Incentive District
Rio Nuevo DowntownRio Nuevo - Downtown
Rio Nuevo Multipurpose Facilities DistrictYes
Tucson Registered NeighborhoodPie Allen
Major Streets & Routes

Gateway Route

RedevelopmentDowntown Redevelopment District
National Register Historic District

Downtown Tucson Historic District

Structure on National Register of Historic Places

Individually Listed

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Historic Records Requests

Address: 300 E CONGRESS ST
Date - 12/25/2024 4:05 p.m.
Total Number Of Historic Records Requests - (2)
Name Action
Address: 300 E CONGRESS ST - Doc Type: CERT OF OCC VIEW
Address: 300 E CONGRESS ST - Doc Type: CERT OF OCC VIEW

Annexations & Original City Zoning (OCZ)

Address: 300 E CONGRESS ST
Date - 12/25/2024 4:05 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Original Town Of Tucson ORIGINAL None

Special Development Requests & Requirements

Address: 300 E CONGRESS ST
Date - 12/25/2024 4:05 p.m.
Total Number Of Special Development Permits - (7)
Activity Number Status Apply Date Expired Date Unit Type Description
H000000148 CLOSED 02/07/2008 N/A Historical Information
T09SA00121 CLOSED 04/29/2009 N/A Historic Preservation Zone NEW RECESSED ENTRY, INCLUDING 2 ENTERIOR WALLS, DOUBLE GLASS DOORS WITH DOUBLE TRANSOM ABOVE APPROVED DECISION HAS BEEN SENT OUT WITH THE FOLLOWING CONDITIONS: ALL WINDOWS TO BE WOOD FRAME; RETURN TO THE TUCSON-PIMA COUNTY HISTORICAL COMMISSION PLANS REVIEW SUBCOMMITTEE FOR REVIEW/RECOMMENDATION ON REHABILITATION OF THE ENTIRE RIALTO BLOCK PROPERTY...05/04/09
T09SA00268 CLOSED 09/21/2009 N/A Historic Preservation Zone RND-09-05 RIALTO BLOCK IMPROVEMENTS - North/West Elevations CONDITIONALLY APPROVED, subject to the following conditions: 1. Approval for the preparation and framing of the storefront openings including window and door framing; 2. Return to the Tucson-Pima County Historical Commission Plans Review Subcommittee with elevation drawings showing details for the storefront prismatic glass, enlargement of the pedestrian entryway doors, details on the octagonal floor tile, installation of wainscoting material and proposal on the parapets (either to rehabilitate the original or leave the parapets off the proposal); 3. Provide two (2) copies of working drawings to the Zoning Administration at the time of permit sign-off, and 4. Obtain the appropriate permits within one (1) year of the Director's decision The issuance of a building permit by Development Services will be based on compliance with all applicable Zoning, Building Code and Fire Code requirements.
T12SA00401 CLOSED 12/04/2012 N/A Historic Preservation Zone
T13SA00007 APPROVED 01/10/2013 N/A Design Review Board
T13SA00112 CLOSED 04/29/2013 N/A Historic Preservation Zone
T13SA00245 APPROVED 08/27/2013 N/A Design Review Board

Permits

Address: 300 E CONGRESS ST
Date - 12/25/2024 4:05 p.m.
Total Number Of Permits - (38)
Permit Status Apply Date Expired Date Unit Type Description
TF-FCP-1122-00163 Complete 11/29/2022 12/01/2023 Fire Construction Permit Modify existing fire sprinkler system to accomodate removed wall in kitchen, and sprinklers in non-operative hood system.
TC-COM-1122-00122 Issued 11/15/2022 04/14/2024 Commercial Building CofO to meet state requirements for space where no remodel work has occurred.
D11-0019 Approved 06/24/2011 N/A Development Package RIALTO BLOCK PATIO
TR-ROW-0324-00349 Complete 03/29/2024 10/09/2024 Right-of-Way (ROW) Each of those locations has a utility box within the ROW (I chose the addresses as close to the utility boxes as possible). The Arts Foundation is working with DTM and Rio Nuevo to wrap these in artist designed vinyl. We are looking to secure permits to allow for the installation at each location. Art work project work to Occur in Multiple locations (corners) within Downtown area. Request Update 7/9/2024: Renewal request 90 days as of 7/11/2024.
DP14-0026 Complete 02/19/2014 01/30/2021 Development Package SITE
DP13-0002 Complete 01/09/2013 01/30/2021 Development Package SITE FOR TI/SHELL- T12CM07950
T07CM03704 CLOSED 09/11/2007 10/13/2010 COMBO DEMO:PORTION OF A 1 STORY BUILDING
T09CM01100 FINAL 05/04/2009 10/13/2010 COMBO TI: NEW STORE FRONT REVISION 1: REPLACEMENT ADDITIONAL DOORS AND STOREFRONT GLAZING REVISION 2: REVISE STOREFRONT
T09CM01524 CLOSED 06/15/2009 12/13/2009 COMBO PARAPET EXTENSION
T09MS00114 ISSUED 04/27/2009 N/A MISC
T09MS00242 ISSUED 09/16/2009 N/A MISC HISTROIC PRESERVATION ZONE REVIEW
T10BU00464 FINAL 03/22/2010 10/30/2010 SPKLR INSTALL 93 NEW FIRE SPRINKLERS AND 25 FEET OF 4 INCH FIRE UNDERGROUND.
T10BU00563 FINAL 04/08/2010 11/20/2010 BUILD FIRE ALARM - RIALTO CREDITS
T10CM00056 FINAL 01/11/2010 10/20/2010 COMBO DEMO:CANOPY & CHIMNEY
T10CM00644 C OF O 03/16/2010 11/20/2010 COMBO TI:OFFICE:ADDITION:BATHROOMS
T10CM00944 WITHDRWN 04/08/2010 N/A COMBO PHASE II:SECOND FLOOR BALCONY:COURTYARD
T10CM02714 C OF O 09/29/2010 04/17/2011 COMBO INTERIOR EXHIBITION SPACE
T10EX00147 CLOSED 03/31/2010 05/30/2010 EXCAV TRENCH 40' TO INSTALL WATER LINE
T10OT00900 FINAL 04/27/2010 01/09/2011 SIGN 18241
T10OT02169 FINAL 10/06/2010 04/16/2011 SIGN 18970
T11CM00817 WITHDRWN 03/17/2011 N/A COMBO TEMP BAR RIALTO BLOCK
T11OT01502 FINAL 07/29/2011 03/13/2012 SIGN BANNER: 45 DAYS 07-29 TO 09-12-2011
T12CM06913 FINAL 10/30/2012 10/15/2013 COMBO TI:INTERIOR DEMO
T12CM07950 FINAL 12/17/2012 02/24/2014 COMBO TI: SHELL
T12CM08253 C OF O 12/31/2012 11/05/2013 COMBO RESTAURANT
T13BU00199 FINAL 02/21/2013 01/27/2015 SPKLR T.I. Work 1st Fl.-New system 2nd fl-Total 201 heads
T13BU00229 FINAL 02/28/2013 10/29/2013 SPKLR T.I. INSTALL 14 NEW SPRINKLERS
T13BU00292 FINAL 03/12/2013 10/29/2013 BUILD FIRE ALARM
T13BU00311 FINAL 03/15/2013 10/29/2013 BUILD FIRE ALARM
T13BU00387 FINAL 04/01/2013 10/29/2013 BUILD HOOD FIRE SUPPRESSION SYSTEM
T13OT00410 FINAL 04/04/2013 10/30/2013 SIGN 2- ILLUM XW / HPZ & TRE APPROVAL 21152
T14BU00134 FINAL 02/04/2014 11/17/2014 SPKLR FIRE SPRINKLER
T14BU00223 FINAL 02/24/2014 10/28/2014 BUILD FIRE ALARM
T16CM08849 C OF O 11/23/2016 08/15/2017 COMBO TI; BAR
T17CM02519 C OF O 04/03/2017 01/02/2018 COMBO BAR
T17FC00112 CLOSED 02/06/2017 04/11/2023 FIRECONS Add one new pendent at existing kitchen to accommodate new walls
T17RW00660 FINAL 02/07/2017 03/12/2017 ROW INSTALLING BENCHES AND STEEL BARRIER WITHIN EXISTING TRE
T20RW02377 FINAL 04/27/2020 06/27/2020 ROW Starting on the North side of Congress and East of Granada Ave place Cox Vault and trench/bore going West 315' continue going North 160'and Place 2nd vault. Place 2nd Cox Vault end. (115 Congress) NOTES: Granada Ave. was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions.

Record Requests

Address: 300 E CONGRESS ST
Date - 12/25/2024 4:05 p.m.
Total Number Of Requests - (2)
Request Number Status Request Date Completed Date Type Description
REQ-0624-04593 Denied 06/27/2024 N/A Requests ** DENIED- NO PRE-ACTIVITY MEETING SCHEDULED/ HELD VIA DASHBOARD** Due to weather restrictions the work could not be completed within the initial 30 day permit timeframe. I am requesting a 90 day extension so that the work can be completed when temperatures are 85 degrees or cooler.
REQ-0724-04751 Approved 07/08/2024 07/09/2024 Requests The work could not be complete under extreme heat. We are requesting to extend the permit 90 days. We have a pre-activity meeting scheduled for July 11 at 10:32am.