Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM07502
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/27/2012 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
11/28/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
11/28/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
11/28/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
11/28/2012 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A1.0; FLOOR PLAN KEYNOTES: NOTE 15 CAN NOT BE APPROVED AT THIS TIME UNTIL A WAIVER IS APPROVED BY THE BUILDING OFFICIAL. 2. SHEET A1.0; DETAILS 1 AND 2: PROVIDE THE QUANTITIY AND SIZE OF CONNECTORS FOR BRACING TO THE STRUCTURE ABOVE AND TO THE TOP OF THE WALL. 3. SHEET A1.0: PROVIDE THE SIZE AND SPACING OF THE WALL STUDS. |
11/28/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Clarify the modifications to the existing lavatory. Keynote 4/MP1.0 indicates that the existing water heater associated with the lavatory is to remain but Keynote 2/MP1.0 calls for a new 1/2" hot water supply for the same lavatory. Show how this is to be done. 2. Show how the temperature of the hot water supply to the lavatories is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. |
11/28/2012 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
11/28/2012 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
11/29/2012 | SPOWELL1 | WWM | REVIEW | Needs Review | |
11/29/2012 | SPOWELL1 | FIRE | REVIEW | Needs Review | |
11/29/2012 | SPOWELL1 | ENGINEERING | REVIEW | Needs Review |