Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T12CM06399
Review Name: COMMERCIAL - NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/22/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Need a site plan. Please check with Zoning, a DP package review may be required. 2. Please provide a large scale toilet plan of both toilets showing all accessibility requirements including all dimensions, fixtures, clearances, signage and accessories. 3. Need vertical grab bars at details 9 and 10/A3 as reqired by ICC A117.1, section 604.5.1. 4. At detail 7/A3, the sink height must be to more than 2'-10". 5. Please provide structural calculations all the roof mounted HVAC equipment. END OF REVIEW |
| 10/22/2012 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 10/30/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 10/31/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 10/31/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. All plumbing fixtures and fittings shall be listed or labeled by a nationally-recognized, accredited conformity assessment company (e.g. UL, ETL, UPC, etc). Reference: Section 301.1.1, UPC 2006. 2. Provide material standards for all plumbing fixtures being provided by others. Reference: Section 401.1, UPC 2006. 3. Provide water closet seats with either an open front or an automatic seat cover dispenser. Reference: Section 408.2.2, UPC 2006. 4. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 5. Show how the installation of the gas-fired water heater complies with the requirements of Section 505.1, UPC 2006 and Section 303.3, IFGC 2006. 6. Provide a detail of the water heater installation, including the valves, expansion tank, flue size, flue height, and flue termination. Reference: Sections 103.2.3, 510.3.1, 605.2, and 608.3, UPC 2006. 7. Provide a detail of the unit heater installation, including the valves, flue size, flue height, and flue termination. Reference: Sections 103.2.3, 510.3.1, UPC 2006. 8. Provide a CW shut off valve for the point-of-use water dispenser. Reference: Section 605.5, UPC 2006. 9. Provide cleanouts for the upper terminals of the building drain and its horizontal branches. Reference: Section 707.4, UPC 2006. 10. Provide cleanouts sized per Section 707.11, UPC 2006. 11. Clarify the gas pipe sizing calculations; there is no natural gas on site, only propane. Include the gas delivery pressure on the plans. Reference: Section 1217.0, UPC 2006. |
| 11/01/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the energy code compliance calculations for the building envelope. Coordinate the details on the drawings with the components shown on the energy compliance calculations. The information on the drawings shall, as a minimum, include U-factors and the SHGC of the fenestration components. Verify that all of the windows have the same projection factor shown on the calculations. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. 2. A note in the storage/equipment room calls for the installation of either a barometric air relief or an exhaust fan. Determine which item is to be installed and, if the fan is to be installed, provide the specifications and electrical requirements for the fan. Reference: Section 106.3.1, IMC 2006. 3. Ventilation for restrooms in public spaces requires a minimum of 75 CFM of mechanical exhaust per water closet or urinal. Reference: Table 403.3, IMC 2006. 4. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted (i.e. the exhaust fan shall run whenever air is being supplied to the restroom). Reference: Section 403.2.1 (4), IMC 2006. 5. Revise the mechanical design as required to avoid using the corridors as return air ducts. Reference: Section 601.2, IMC 2006. |
| 11/06/2012 | GERRY KOZIOL | WWM | REVIEW | Denied | 1: RASCH CONSTRUCTION, INC - REGIONAL OFFICE & SERVICE YARD 2: NEED TO SHOW LOCATION/METHOD OF CONNECTION TO PUBLIC SEWER ON BUILDING PLANS 3: NEED TO SHOW SIZE & LOCATION OF ALL WATER METERS ON THE PROPERY FOR SEWER CONNECTION FEE CALCULATION |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/30/2013 | CPIERCE1 | OUT TO CUSTOMER | Completed |