Permit Number: T12CM05090
Parcel: 12801007A

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T12CM05090
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/17/2012 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Approved
09/17/2012 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Verify the existing pipe sizes, the gas loads and the developed lengths to each gas load; based on the gas piping plan on sheet P.3, the existing piping is too small to accommodate even the existing loads shown on the drawing. [Original comment: Provide complete gas piping diagrams for RTU 9 including demand, available pressure from utility, pipe size, developed length, etc.]
2. Revise (or remove) detail 6/M.2 and note #9 of detail 1/M.2 to clearly show that the condensate drain from RTU-9 will not dump onto the roof. Detail 3/P.3 correctly notes the termination of the condensate drain. [Original comment: PP M.2 --- per amended 2006 IMC City of Tucson Section 307 Condensate Disposal 307.2.1 Condensate Disposal. Condensate disposal shall be allowed to terminate as follows:
a. Into an approved fixture tailpiece, floor sink, funnel drain, waster air-gap fitting, mop sink, and laundry tray. OR
b. at or below grade outside the building in an area capable of absorbing the condensate flow without surface drainage. OR
c. over roof drains, gutters or downspouts that connect to drainage pipes, provided they terminate at or above grade in an area capable of absorbing the condensate flow without surface drainage.]
09/17/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Revise detail 2/P.2 to show the water hammer arrestor installed per the manufacturer's listing (i.e. between the last two fixtures on a multiple-fixture branch line, not downstream of the last fixture). Reference: Sections 310.4, 609.10, and 609.10.1, UPC 2006. [Original comment: PP P.2 Approved mechanical devices for absorbing water hammer do not include air chambers. Please provide a listed device upstream of the last fixture on the affected branch line.]

Final Status

Task End Date Reviewer's Name Type of Review Description
09/24/2012 GERARDO BONILLA OUT TO CUSTOMER Completed
09/24/2012 GERARDO BONILLA REJECT SHELF Completed