Permit Number: T12CM05090
Parcel: 12801007A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T12CM05090
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/24/2012 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Denied 1) PP A0.2 & A2.1 Please show 18" vertical grab bar at water closets per ANSI 117.1.

2) Clarify where structural details are actually being used. Please use standard cut references.

3) Provide structural calculations associated with detail 3 for new equipment support. Clarify type and location of trusses to remain in place.
08/29/2012 GERRY KOZIOL WWM REVIEW Approved
08/30/2012 LEERAY HANLY PLUMBING-COMMERCIAL REVIEW Denied 1) PP P.2 Approved mechanical devices for absorbing water hammer do not include air chambers. Please provide a listed device upstream of the last fixture on the affected branch line.
08/30/2012 MARTIN BROWN FIRE REVIEW Approved
08/30/2012 LEERAY HANLY ELECTRICAL-COMMERCIAL REVIEW Approved
08/30/2012 LHANLY1 WATER REVIEW Approved
08/30/2012 LEERAY HANLY MECHANICAL-COMMERCIAL REVIEW Denied 1) Provide complete gas piping diagrams for RTU 9 including demand, available pressure from utility, pipe size, developed length, etc.

2) PP M.2 --- per amended 2006 IMC City of Tucson Section 307 Condensate Disposal 307.2.1 Condensate Disposal.

Condensate disposal shall be allowed to terminate as follows:
Into an approved fixture tailpiece, floor sink, funnel drain, waster air-gap fitting, mop sink, and laundry tray. OR at or below grade outside the building in an area capable of absorbing the condensate flow without surface drainage. OR
over roof drains, gutters or downspouts that connect to drainage pipes, provided they terminate at or above grade in an area capable of absorbing the condensate flow without surface drainage.

3) PP M.2 Exhaust fan schedule note 3 indicates to connect fans to lighting. As lighting is on an occupancy sensor this does not comply with IMC section 403.2.1. Please provide sequence of operation showing compliance or interlock exhaust fans with RTU 7.