Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM04529
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/25/2012 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
07/25/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
07/25/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
07/25/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
07/25/2012 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEETS DA-1, DA-2, DA-3, AND DA-4: THE ARCHITECT OF RECORD TAKES THE RESPONSIBILITY FOR ACCESSIBILITY ISSUES, NOT THE CONTRACTOR. REMOVE OR REWORD THESE SHEETS. 2. SHEET D1; SECTION 3: WHY IS THIS SECTION ON THE DEMOLITION SHEET? VERIFY. 3. SHEET F1: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE SHEET. 4. SHEET A1; FLOOR PLAN NOTES: NOTE 3 INDICATES FINISH DESIGNATIONS ARE LOCATED ON SHEETS A1 AND A2. REVISE. 5. SHEET A2; DETAIL 6: THE 2X12 SUPPORTING THE COILING GRILLE REQUIRES A STRUCTURAL CALCULATION. THE DETAIL INDICATES THE 2X12 IS BLOCKING BETWEEN STUDS. VERIFY HOW THIS COILING GRILLE IS SUPPORTED. IF THIS IS NEW LOAD ON THE EXISTING ROOF, PROVIDE STRUCTURAL CALCULATIONS TO SHOW THE EXISTING STRUCTURE IS CAPABLE OF SUPPORTING THE NEW LOAD. 6. SHEET A3: THE CITY OF TUCSON REQUIRES ALL LETTERING (UPPER AND LOWER CASE) TO BE A MINIMUM OF 3/32" IN HEIGHT. REVISE SHEET. 7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
07/25/2012 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
07/25/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Clarify which plumbing code is to be used for this activity. 2. Provide a waste and vent riser diagram for the new plumbing work. 3. Provide clarification of the installation of the water purification system (e.g. listing information and manufacturer's installation instructions). |
07/25/2012 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
07/25/2012 | ERIC NEWCOMB | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
07/26/2012 | GERRY KOZIOL | WWM | REVIEW | Approved | |
07/26/2012 | MARTIN BROWN | FIRE | REVIEW | Approved |