Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T12CM02063
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/02/2012 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
07/03/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | GENERAL 1. Please provide review response comments in a standard 10 to 12 size lettering font. 2. Please provide a new special inspector's certification listing the names of the individual inspectors that are to do the actual inspections. SHEET FLSOOr 3. Please complete the occupant load calculation as started in Section 1004 Schedule. Calculate and show the occupant type and number per each level and provide not only a floor by floor occupant load but a final total summary occupant load of the project. SHEETS FLS00r, FLS01R, FLS02r and FLS03r 4. How does the occupancy load summary schedule shown on sheet FLS00r relate to the exiting floor plans on sheets FLS01r through FLSO3r? 5. Please label all stair plans on sheets FLS01r through FLS03r as labeled per the occupancy load summary and correlate the exiting occupant numbers between the two. SHEET A520r 6. As per previous comment 19, these stair plans and details are not coordinated to the details shown on sheet A450. Please reconcile. 7. Stair detail 1 and 3 does not set flat on the first floor level. The last bottom riser is floating in the air about 2" to 3" above the finished floor. COMMENTS 27 THROUGH 40 8. Approved END OF COMMENTS |
07/10/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Comment not resolved; the balancing notes on sheets M205r, M206r, and M207r show a total of 330 CFM of outside air for each heat pump but according to sheet M401r, the two heat pumps are scheduled to have only 300 CFM each of outside air. [Original comment: Coordinate the scheduled outside air quantities for HP-R1 and HP-R2 on sheet M401r per the outside air calculations shown on sheets M205r, M206r, and M207r. Reference: Sections 106.3.1 AND 403.3, IMC 2006.] |
07/10/2012 | KEN BROUILLETTE | FIRE | REVIEW | Denied | Still need new sheet flsOOR. Made phone call weeks ago with Arct. but plans do not reflect any changes. I will deny and wait for the new sheets to be submitted and put in rolled sets. |
07/10/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not resolved; provide details for the installation of the water distribution system booster pumps. Reference: Sections 106.3.1 and 606.5, IPC 2006. [Original comment: Provide fixture descriptions for all plumbing fixtures. All plumbing fixtures and fittings shall be listed or labeled by a nationally-recognized, accredited conformity assessment company (e.g. UL, ETL, UPC, etc) Reference: Sections 301.1.1 and 401.1, UPC 2006.Provide installation details for the booster pump for the water distribution system. Reference: Sections 103.2.3 and 609.8, UPC 2006.] 2. Comment not addressed; show that the hot water storage tank is protected from siphonage per Section 504, IPC 2006. [Original comment: Provide a vacuum relief for the hot water storage-vessel. Reference: Section 608.7, UPC 2006.] 3. Comment not resolved; the gutters and downspouts shown on sheet A208R have been rearranged and are now shown on sheet P208r but it is not clear where the downspouts for the gutters terminate or how the overflows from the roof level are being handled. What is meant by the abbreviation "DS"? It appears as if up to 9676 square feet of overflow drainage could be introduced to the 5th level. Reference: Sections 106.3.1 and 1107, IPC 2006. [Original comment: Provide sizing information for the gutters and downspouts shown on sheet A208R. Reference: Section 1106.0, UPC 2006.] 4. Clarify how the back-to-back water closets (floor-mounted, rear-outlet water closets have been specified) are to be plumbed. Reference: Section 706.3, IPC 2006. |
07/17/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T12CM02063 345 E Congress Plaza Centro Student Housing 1. Last item needed, as per 2005 NEC 700.27,provide a Selective Coordination Analysis for Emergency System overcurrent devices. 2. Sheet 401r. the feeder circuits coming from SES-R to the 400 amp transfer switch and the 100 amp transfer switch are going to the wrong equipment, the 100 amp goes to the 400 amp transfer switch and the 400 amp goes to the 100 amp transfer switch. Ray T Majuta Electrical Plan Review PDSD, City of Tucson 7/18/2012 Ray.Majuta@tucsonaz.gov |
07/26/2012 | GERRY KOZIOL | WWM | REVIEW | Denied | 1. PLAZA CENTRO STUDENT HOUSING - RAILYARD DP12-0029 - $494,029.39 - 1831FU @ SFR RATE FOR APARTMENTS & 18FU @ COMMERCIAL RATE FOR JANITOR CLOSETS 2. CONNECTIONG TO EXISTING TO ON SITE PRIVATE SEWER 3. NEED CAPACITY EVALUATION - KURT STEMM 740-6607 - PCRWRD-3RD FLOOR 4. NEED APPROVED COT WATER PLAN & COT WATER EMTER RECEIPT FOR SEWER CONNECTION FEE CALCULATION |