Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T12CM01566
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/05/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | SHEET A4.4 1. Detail 2 does not show accessible urinal. SHEET A4.6 2. Detail 1 shows accessible urinal in an alcove with one side deeper than 2'-0". In this situation ICC A117.1, Sections 605 and 305.7 requires a 3'-0" wide clear urinal stall. SHEET S3.1 3. Provide structural calculations for new HVAC load and framing on existing structural framing. SHEET S4.0 4. Provide structural calculations fo all new steel framing and concrete foundations. END OF REVIEW |
07/11/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Revise the size of the common condensate drain pipes shown on sheet M2.3 per Section 307.2.2, IMC 2006, as amended by the City of Tucson. |
07/11/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide additional cleanouts in drainage pipe for each aggregate horizontal change of direction exceeding 135 degrees (see soil and vent riser diagram 2/M8.1). Reference: Section 707.5, UPC 2006. 2. Provide cleanouts sized per Section 707.11, UPC 2006 (see soil and vent riser diagram 2/M8.1). |
07/23/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/26/2012 | FERNE RODRIGUEZ | OUT TO CUSTOMER | Completed |