Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T12CM01566
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/09/2012 | GERRY KOZIOL | WWM | REVIEW | Approved | |
04/10/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide plans sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. Clarify the plumbing code to be used for this activity. The City of Tucson Applicable Codes block on sheet M0.0 refers to the 2006 UPC with COT amendments but the Applicable Codes block on sheet G1.1 refers to the 2006 IPC with no local amendments. This review has been made using the 2006 UPC with COT amendments. 3. Revise the font size used on the drawings to a minimum of 3/32-inch (all upper case). Reference: Section 106.1.1, IBC 2006. 4. The maximum flow rates for plumbing fixtures shall be consistent with ARS Title 45, Chapter 1, Article 12, 45-313. (See text at: http://www.azleg.state.az.us/ArizonaRevisedStatutes.asp). In addition, accessible metering faucets shall remain open for a minimum of 10 seconds. Reference: Section 402.1, UPC 2006, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-2003. 5. Clarify the presence of water connections for the waterless urinals (as shown on sheets M8.1 and M8.1). Reference: Section 103.2.3, UPC 2006. 6. Show that the restroom floors slope toward the floor drains. Reference: Section 411.2, UPC 2006. 7. Each piece of equipment requiring backflow protection (e.g. the coffee maker and ice machine) shall be independently protected if there is the possibility of cross-contamination. Reference: Sections 602.2 and 603.0, UPC 2006, as amended by the City of Tucson. 8. Provide indirect waste piping for the discharges of the reduced pressure backflow preventers (including those located in the break rooms) to an approved indirect waste receptor. Reference: Sections 603.3.7 and 603.3.9, UPC 2006. 9. Limit the water velocity to less than 8 fps for the copper piping (5fps for hot water). Reference: Sections 610.12 and A 6.1, UPC 2006; and IAPMO IS 3-2000, Section 610.0. 10. Show the location of the two-way cleanouts (indicated on sheets M8.1 and M8.2) on the plumbing plans. Two-way cleanouts may be installed at the junction of the building drain and the building sewer but are not required if an upper terminal cleanout is installed. Reference: Sections 707.4 and 707.6, UPC 2006. 11. Revise the installation of the ice machine drains to be indirectly connected to the sanitary drain system using an air gap. Provide separate indirect waste pipes for the ice maker itself and for the ice storage bin. Reference: Sections 801.2.3 and 801.5, UPC 2006. 12. Provide a vent for each fixture trap (e.g. floor drains). Reference: Sections 901.0 and 910.1, UPC 2006. 13. Modify trap arm lengths to conform to Table 10-1, UPC 2006. Reference: Section 1002.2, UPC 2006. |
04/11/2012 | ROBERT SHERRY | WATER | REVIEW | Approved | |
04/12/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide plans sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. Revise the font size used on the drawings to a minimum of 3/32-inch (all upper case). Reference: Section 106.1.1, IBC 2006. 3. Clarify why sheets M1.2 and M1.2A are nearly identical. Reference: Section 106.3.1, IPC 2006. 4. Provide labels for the mechanical piping shown in rooms 702 and 703 on sheet M2.3. Reference: Section 106.3.1, IPC 2006. 5. Clarify the ventilation calculations for AHU S3; it does not appear in ventilation calculations. Reference: Section 106.3.1, IPC 2006. 6. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson. 7. Clarify the termination of the condensate drains for the split system A/C units serving rooms 702 and 703. Condensate drains may not terminate in an area incapable of absorbing condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2006 as amended by the City of Tucson. |
04/23/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | GENERAL 1. Please provide structural calculations: a. For all structural building revisions shown on the structural drawings. b. All new roof top mounted HVAC equipment. SHEETS A4.4 AND A4.6 2. Please show all code accessibility requirements on all toilet plans and toilet elevations. Please include all dimensions, clearances, accessories, fixtures and all door clearances. 3. Please provide ambularory toilet stalls for all toilet rooms as required by the 2006 IBC, Section 1109.2.2 and ICC ANSI 117.1, Section 604.9. SHEET A5.2 4. At detail 1, please show structural analysis of how this detail complies with the 2006 IBC, Section 1607.13, 5 psf horizontal loading. END OF REVIEW |
04/25/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T12CM01566 1151 E Hermans Rd Ratheon TI 1. Plans must be sealed by an Arizona Registrant. 2.Some of the drawings provided which appear to reflect existing conditions are too ligh, provide darker. 3. Provide a fixture schedule and cut sheet for all fixtures including a letter per fixture, wattage of lamps, number of lamps per fixture and total wattage, type of lamp, and type of mounting. 4. Provide 2006 IECC light bugget calculations and switching requirements per IECC to be used. 5. Provide sizes of all grounding conductors to be used on transformers. 6. Roof mounted equipment requires a maintanence receptacle per 2005 NEC 210.63. 7. Various electrical sheets indicate"provide a splice box" for rerouting feeders, provide a discription of type , mount and possible locations which can be used. 8. Provide a complete fault current analysis. 9. Provide tennant and total building load calculations. Indicate how each item was reviewed and addressed. Ray T Majuta Electrical Plan Check PDSD, C of Tucson 4/25/2012 Ray.majuta@tucsonaz.gov |