Permit Number: T12CM01174
Parcel: 117050240

Address:
412 N 4TH AV

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T12CM01174
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/23/2012 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied GENERAL
1. Please provide a scale to all details.
2. Several details are not to scale. Please set all details to an industry accestable scale factor.
SHEET A2
3. Please provide a large scale of the storage room ramp. Provide all required dimensions, slopes, landings, and rails as per the 2006 IBC, Section 1010, RAMPS.
a. Confirm complaint landings
b. Confirm that new ramp does not encroach on required spaces for electrical panels.
4. Please provide a large scale detail of the exterior ramp. This ramp is not compliant. Provide all required dimensions, slopes, landings, and rails as per the 2006 IBC, Section 1010 Ramps and ICC A117.1, Section 405.
a. Provide handrails on both sides of ramp
b. Top and bottom landings do not meet requirements of Section 405.7
c. There is not sufficient egress clearance to exit from behind the cooler box.
5. Provide a section through the 5' high masonry wall showing mounting of compressors. Provide complete structural calculations and details. Refer to Mechanical for additional operational height clearance comments.
SHEET A4
6. Please provide a number for all details and reference this number from the floor plan.
7. Both toilet plans are not to scale and appear to be non compliant in regards to required water closet clearances as per ICC A117.1, Section 604.3.
a. Please provide a large scale plan for both toilet rooms, drawn to scale with a scale factor in the title. Show all required accessible dimensions, clearances, accessories and fixtuires.
8. Toilet rooms signs are to be located as per ICC A117.1, Serction 703.3.11. Not on the door. Reference section 703 for signage requirements.
9. Please confirm that all new partitions are braced from the roof framing structure above to meet lateral load requirements of the 2006 IBC, Section 1607.13 (5 psf).
10. Please provide structural calculations for detail 102.
END OF REVIEW
03/26/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Correct the labeling for the water supply isometric, A/P2. Reference: Section 103.2.3, UPC 2006.
2. Show size, route and termination of the T&P relief piping for each water heater. Reference: Section 608.5, UPC 2006.
3. Clarify the configuration of the waste and vent piping for fixtures P4 and P6 and the intended use of the sink, P6. The equipment schedule on sheet A3 calls for the sink, P6, to have an indirect drain to the floor sink, P4. If they are both to be directly-connected, the upper fixture for a wet vent shall not exceed 2 drainage fixture units. Reference: Section 908.1, UPC 2006.
03/26/2012 ROBERT SHERRY WATER REVIEW Approved
03/26/2012 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Show how the fan coils are being connected to the building structure and provide calculations to show that the building structure is not being adversely affected. Reference: Section 302.1, IMC 2006.
2. Show that the seven compressors for the refrigeration equipment are being installed high enough above the four heat pumps to allow adequate clearance for the heat pumps in accordance with the conditions of their listing and the manufacturer's installation requirements. Reference: Section 304.1, IMC 2006.
3. Show the size, routing, and termination of the condensate drains for the fan coil units and for the new walk-in cooler. Reference: Section 307.2, IMC 2006 as amended by the City of Tucson and Section 814.0, UPC 2006.
03/30/2012 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Denied 1. Provide one line diagram complete with panel schedules , locations of equipment, load calculations, new and or existing, AIC, for service `B'.
2. Identify electrical panels on plan sheet ED1.0.
3.Plan sheet E2.0 indicates panels `L1A' and `L2A' as relocated, no reference on one line diagrams ?
4.No reference to any new or existing receptacles on power plan.Please show locations, circuit designation.
Plan review
Dan Santa Cruz
04/06/2012 CPIERCE1 ZONING REVIEW Needs Review
04/06/2012 CPIERCE1 WWM REVIEW Needs Review