Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T12CM00223
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/01/2012 | MARTIN BROWN | FIRE | REVIEW | Approved | |
02/02/2012 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | SHEET A1 1. Separation distance between the two exit doors is not compliant with the 2006 IBC, Section 1015.2.1. It is a few feet shy of meeting the minimum calculated distance. SHEET A5 2. At detail 6, please provide all required accessible dimensions and clearances as per ICC A117.1, Chapter 6. GENERAL 3. Please provide structural calculations for all lighting pole foundations. 4. Please provide special inspections certifications as listed in the conditions menu of this permit application. END OF REVIEW |
02/03/2012 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1. Provide complete single line diagram for service eqip,please include: Voltage and phase. Comete fault current analysis. Feeder loads. IECC calculations. Compliance with Tucson Lighting Code. |
02/15/2012 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a site drawing to show the location of the public sewer and the proposed point of connection for the building sewer. Reference Section 103.2.3, UPC 2006. 2. Provide a site drawing showing the size, route, and slope of the building sewer. Reference: Section 103.2.3, UPC 2006. 3. Show that the temperature of the hot water supply to the public lavatories will be controlled to a maximum delivered temperature of 110 degrees Fahrenheit (e.g. Factory-set temperature for the instantaneous water heater). Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 4. Provide water pressure and water pipe sizing calculations. Indicate the required minimum pressure for the proposed eyewash. Reference: Section 610.1, UPC 2006. 5. Provide the rim elevation of the next upstream sanitary manhole and the first floor elevation. Determine the need for a backwater valve per Section 710.1, UPC 2006, as amended by the City of Tucson 6. Revise the downspout sizing based Table 11-1, UPC 2006. The 2006-edition of Table 11-1, UPC 2006 limits a 3" downspout to a tributary area of 2,147 square feet (earlier editions, such as the 1994 edition, did allow 2,930 square feet of tributary area to be drained with a 3" downspout). Reference: Section 1101.11.1 and Table 11-1, UPC 2006. |
02/15/2012 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that a notation shall be placed beneath the seal, either written, typed, or electronically generated, that provides the day, month, and year of the expiration of current registration. (Effective March 8, 2008). 2. Provide energy code compliance calculations for the building envelope; use the climate zone for Pima County < 4,000 feet. Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. 3. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson. 4. Provide structural calculations to verify that the roof is capable of supporting the condensing units and Z-purlins are capable of supporting the fan coil units. Reference: Section 302.1, IMC 2006. 5. Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restrooms during occupied hours will be exhausted. Reference: Section 403.2.1 (4), IMC 2006. |
02/15/2012 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 103.2.3, UPC 2006. |
02/28/2012 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | The site plan must be approved before the building plan can be approved. |
02/28/2012 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: O'Reilly Auto Parts - 51 S. Pantano Road T12CM00223 Building Plan (1st Review) TRANSMITTAL DATE: February 28, 2012 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning can not approve the building plan until the development package has been approved. 7. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
03/02/2012 | GERRY KOZIOL | WWM | REVIEW | Denied | 1. OREILLY AUTO PARTS DP12-0014 2. NEED TO SHOW LOCATION/METHOD OF CONNECTION TO PUBLICK SEWER IN BUILDING PLAN SET - NEED PCRWRD REVIEW OF LOCATION/ MEDTHOD OF CONNECTION TO PUBLIC SEWER - CHAD AMATEAU 740-6547 3. NEED PCRWRD CONSTRUCTION PERMIT REVIEW & APPROVAL (FRONTS 15" PUBLIC SEWER) YVONNE SUAREZ 740-6733 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/06/2012 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |