Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: FLOODPLAIN
Permit Number - T11OT01355
Review Name: FLOODPLAIN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/08/2011 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | July 8, 2011 (Special Inspection Not Required) The applicant is authorized to use a portion of the flood hazard area (FEMA Zone AE, Panel 1433) in the City of Tucson, Arizona, on the property described as 218 North 1st Avenue for the purpose of constructing a new deck structure along with associated site and right of way improvements. The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard regulations, and are particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations and Watercourse Amenities, Safety, and Habitat regulations require the issuance of an additional Floodplain Use Permit. The following conditions shall apply to this permit. 1. All work shall conform to the improvement plans submitted as Activity T11CM01433 which is made part of this permit. 2. The deck is not a structure as regulated by the floodplain ordinance and the NFIP. Any walls the addition of any walls or roof will require additional floodplain review. 3. Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties. 4. Any additional development including construction of walls or fences will require separate floodplain use permits 5. This permit becomes invalid and is subject to additional floodplain review, if any required development permit(s') changes the configuration of the structure and or site development. This Floodplain Use Permit will be automatically revoked and becomes invalid for non-compliance to conditions set forth in this permit. The applicant is authorized by the City Engineer to receive a floodplain use permit subject to the above referenced conditions and restrictions. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/11/2011 | DELMA ROBEY | OUT TO CUSTOMER | Completed |