Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T11CM03806
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/05/2012 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 01/05/2012, Submittal will be approved after the Development package is approved. |
01/09/2012 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
01/12/2012 | GERRY KOZIOL | WWM | REVIEW | Denied | 1. QUICKTRIP #1461 - NO CREDIT - NO DEMO SHOWN 2. 4" HCS CONNECTION TO EXISTING 8" PUBLIC SEWER IN JUAREZ STREET PER UTILITY PLAN C150 - NEED PCRWRD 1ST FLOOR CHAD AMATEAU REVIEW - 740-6547 3. NEED CAPCITY REVIEW - PCRWRD-3RD FLOOR/KURT STEMM 740-6607 4. NEED WASTEWATER/WC REVIEW OF GREASE INTERCEPTOR - TOM TOMCHAK - 3035 E EL CAMINO DEL CERRO - 724-6200 |
12/15/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
12/19/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | GENERAL; 1.For the purpose of assessing additional plan review fees, please submit a written summary of the deferred submittals to the building official, Mr. Ron boose. 2. Please provide approved Site Plan. SHEET A130 3. Please show roof slopes. SHEET A530 4. The accessible urinal is to have a 3'-0" wide alcove with a 2'-0" recess as peer ANSI 117.1, Section 605.3 and 305. 5. Details A1 and A6: Please provide elevation references. SHEET A601 6. Insure all exit doors comply with the 2006 IBC, section 1008.1.9: Panic Hardware. END OF REVIEW |
12/19/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
12/28/2011 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Quick Trip @ 1401 S. Alvernon T11CM03806 - Building T11CM03807 - Fuel Canopy T11BU01653 - Underground Tanks Building Plan (1st Review) TRANSMITTAL DATE: December 28, 2011 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning can not approve the building plan until the development package has been approved. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
12/29/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide information on the sequence of operation for the restroom exhaust fans to show that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (4), IMC 2006. 2. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson. |
12/29/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. A double check valve (e.g. Wilkins model 740) is not acceptable for protecting the water supply to a carbonator. Reference: Section 603.4.12, UPC 2006. 2. If PEX tubing is to be utilized for the hot water recirculation system, provide information showing that the material has been listed by NSF for continuous recirculation applications (e.g. NSF P171 Cl-R). Reference: Sections 301.1.1 and 604.1, UPC 2006. 3. Modify the trap arm lengths (i.e. the note on sheet P101) to conform to Table 10-1, UPC 2006. Reference: Section 1002.2, UPC 2006. |
12/29/2011 | ROBERT SHERRY | WATER | REVIEW | Approved |