Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T11CM03210
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/06/2011 | DAVE MANN | FIRE | REVIEW | Approved | Fire notes: Separate permits are required for tanks. |
10/18/2011 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. GEOTECHNICAL INVESTIGATION REPORT: PROVIDE AN ALLOWABLE END BEARING CAPACITY TABLE IN THE REPORT FOR DRILLED SHAFT DESIGN (SIMILAR TO PROJECT T11CM03205). 2. SHEET CA-1; CANOPY PLAN: KEY NOTE 2 INDICATES TO SEE STRUCTURAL DRAWINGS FOR THE CONCRETE PAVING. WHERE IS THAT LOCATED ON THE DRAWINGS SUBMITTED? 3. SHEET CA-4; SECTION C: A NOTE INDICATES TO SEE SHEET E1 FOR THE TUBE COLUMN SIZE. REVISE THE NOTE (NO SHEET E1). 4. SHEET CA-4.1; SECTION E: A NOTE INDICATES TO SEE SHEET E1 FOR THE TUBE COLUMN SIZE. REVISE THE NOTE (NO SHEET E1). 5. GENERAL: ALL DEFERRED SUBMITTALS MUST BE APPROVED IN WRITING BY RON BOOSE (BUILDING OFFICIAL) BEFORE THOSE SUBMITTALS WILL BE REVIEWED. RON.BOOSE@TUCSONAZ.GOV. 6. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
10/26/2011 | DAVID RIVERA | ZONING | REVIEW | Denied | Development plan is under review through the CDRC Review Process. As of this date the plan has not been approved. Zoning will re-review the building plans on the next submittal and compare the building plans to the approved development plan. Zoning will review the building plans to ensure compliance with the approved development plan if the DP has been approved and stamped by the CDRC manager. If available include a copy of the approved DP on the building submittal. Additional comments may be forthcoming. |
10/27/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | See comments for T11CM03209. Ray T Majuta 10/29/11 |
11/01/2011 | PAUL MACHADO | ENGINEERING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/30/2011 | CPIERCE1 | OUT TO CUSTOMER | Completed |
11/30/2011 | SUE REEVES | REJECT SHELF | Completed |