Permit Review Detail
Review Status: Completed
Review Details: CELL TOWER/ANTENNAS
Permit Number - T11CM01985
Review Name: CELL TOWER/ANTENNAS
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/28/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
| 06/29/2011 | MICHAEL WYNEKEN | PLANNING-CITY HALL | REVIEW | Approved | |
| 07/06/2011 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. DRAWING 05; STRUCTURAL ANALYSIS (PAGE 1): ALL OF THE ANTENNA DESCRIPTION NOTES IN THE ANALYSIS DO NOT MATCH ALL OF THE ANTENNAS SHOWN. CLARIFY. 2. SHEET S1 (TOWER ELEVATION); STRUCTURAL ANALYSIS: UNDER THE "NEW TOWER MODIFICATIONS" ON SHEET S1, HOW WERE THE NEW ANGLE SIZES DETERMINED? NO CALCULATIONS WERE INCLUDED FOR THIS REVIEW. 3. SHEET S1 (TOWER ELEVATION); STRUCTURAL ANALYSIS: UNDER THE "NEW TOWER MODIFICATIONS" ON SHEET S1, HOW WAS THE MAT FOUNDATION SIZE AND REINFORCING DETERMINED? NO CALCULATIONS WERE INCLUDED FOR THIS REVIEW. 4. SHEET S1; STRUCTURAL UPGRADE RESULTS: A NOTE HERE INDICATES AN ADDITIONAL STRUCTURAL ANALYSIS REPORT (REVISION 2, MAY 6, 2011) WAS USED. PROVIDE THAT REPORT. 5. SHEET S2; ELEVATION B/S2-S2: A DIMENSION NOTE INDICATES "CLIP LEG SEE FIT-UP NOTE". IS THE ANGLE LEG TO BE FIELD CUT? IS THIS TO BE INSPECTED BEFORE IT IS INSTALLED TO INSURE "TIGHT FIT-UP"? CLARIFY. 6. STRUCTURAL ANALYSIS; PAGE 6 (MATERIAL PROPERTIES): IT IS STATED THAT AN ALLOWABLE SOIL BEARING PRESSURE OF 2500 PSF HAS BEEN USED FOR THIS ANALYSIS. PROVIDE AN EXPLANATION OF WHERE THIS VALUE CAME FROM. TABLE 1804.2 OF THE IBC OR THE CITY OF TUCSON AMENDMENTS DO NOT LIST SUCH A VALUE FOR PRESUMPTIVE BEARING. IS THERE A PREVIOUS SOILS INVESTIGATION REPORT? 7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 07/14/2011 | BRIAN HEFFERNAN | COMMUNICATIONS | REVIEW | Denied | NEED COMMUNICATIONS FORM FOR REVIEW |
| 07/14/2011 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Passed | NO NEW ELECTRIC. ANTENNA AND CO-AX ONLY |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/29/2011 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
| 08/29/2011 | SUE REEVES | REJECT SHELF | Completed |