Permit Review Detail
Review Status: Completed
Review Details: SITE
Permit Number - T11CM01939
Review Name: SITE
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/19/2011 | RBROWN1 | ADA | REVIEW | Approved | |
08/22/2011 | STEVE SHIELDS | ZONING | REVIEW | Passed | |
09/12/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
09/15/2011 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approv-Cond | TO: Olsson Associates SUBJECT: City of Tucson Park - Arroyo Chico Urban Greenway Engineering Resubmittal Review ADDRESS: 410 S Tucson Bl LOCATION: Tucson Bl to Parkway Terrace FLOODPLAIN STATUS FOR PHASE 1: X-unshaded zone & AE zone, 2283L REVIEWER: Elizabeth Leibold, P.E. ACTIVITY NUMBERS: T11CM01939, T11OT01226 (Floodplain Use Permit) SUMMARY: A revised submittal package was submitted for the proposed City of Tucson Arroyo Chico Urban Greenway Park improvements. Engineering Division of Planning & Development Services Department has received and reviewed the plan sheets, revised W.A.S.H. - ERR report, revised drainage report, and revised SWPPP documents. Engineering Division recommends approval of the applications and provides the following as conditions to the permit to be addressed during construction activities. PRIOR TO ISSUANCE OF ANY PERMITS A GRADING PERMIT IS REQUIRED. CONDITIONS OF PERMITS: The following 4 conditions apply to permits T11CM01939 and T11OT01226: 1) The existing fence indicated by Demolition Note 6 on sheets SP-1 and SP-2 may be utilized as the temporary fencing that will be required to be in place during construction to protect existing Protected Riparian Habitat areas. Otherwise a temporary fence is required to be installed prior to commencement of any work at the site and shall remain until project completion and then removed from the site. 2) Permanent fencing shall be inspected by PDSD Engineering - call for inspection at commencement of fencing construction and for final inspection. 3) SWPPP interim erosion controls shall be in place prior to commencement of work. All temporary controls shall be removed, and permanent erosion controls shall be in place, prior to final approvals. 4) Arroyo Chico Wash shall remain undisturbed. Stockpiling materials, vehicular traffic, or any other construction activity is prohibited. If it is determined that there is disturbance outside of the approved disturbance limits or within the Arroyo Chico Wash, a stop work order may be issued, resubmittal, mitigation plans, and fees may be required. If you have questions, call me at 837-4934. Elizabeth Leibold, P.E., CPM, CFM Civil Engineer Engineering Division Planning & Development Services Department |
09/16/2011 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/03/2011 | SUE REEVES | APPROVAL SHELF | Completed |
11/03/2011 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |