| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/10/2011 | RONALD BROWN | ADA | REVIEW | Passed | |
| 08/11/2011 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 08/15/2011 | GERRY KOZIOL | WWM | REVIEW | Denied | NEED CIVAL DRAWINGS/SITE PLAN SHOWING LOCATION/METHOD OF CONNECTIONS TO EXSISTING BUILDINGS/MODULARS TO PUBLIC SEWER |
| 08/16/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Provide special inspector certifications as per sheet S1.1. prior to permit issuance. 2. Overflow roof drain detail does not work. Reference Mechanical plumbing comments for code compliance directions. END OF REVIEW |
| 08/16/2011 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Cox Communications - 4777 E. 29th T11CM01588 Building Plan (1st Review) TRANSMITTAL DATE: August 16, 2011 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning can not approve the building plan until the Site plan has been approved. Plumbing Review section still has site comments to comply with. 3. As the site, landscape & building plans have been submitted together combine the plans together and revise the drawing index to reflect all sheets as one set prior to the next submittal. 4. Zoning will re-review the building plan on the next submittal to insure compliance with the approved Site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\bldg\t11cm01588.doc |
| 08/16/2011 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 08/17/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/18/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide energy code compliance calculations for the building envelope (use the climate zone for Pima County < 4,000 feet). Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. |
| 08/18/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a design for the new 3" building sewer shown on the north side of the building addition. The site plan for the building does not show any new building sewer for this building. Reference: section 106.3.1, IPC 2006. 2. Provide calculations to show that the size of the two overflow openings in the roof drain collector boxes have a drainage capacity equal to the minimum required scupper size. Reference: Section 1107.1, IPC 2006. |
| 08/22/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T11CM01588 4777 E 29th ST 1. Please provide information concerning the operation consisting of Panel I1 having two feeders going to Panel I2 and the Kirt Key interlocks. 2. Provide information regarding the New Inverter, having a 300 amp input and a 250 amp output and how it affects Panel I2. 3. Provide Panel Schedules including loads for Panels I1 and I2. Ray Majuta, PDSD,C of T, Elect Pln CK, 8/25/11, 520/837/4988 |
| 08/24/2011 | LOREN MAKUS | ENGINEERING | REVIEW | Approved |