Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T11CM00095
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/18/2011 | DAVE MANN | FIRE | REVIEW | Approved | |
| 01/18/2011 | RONALD BROWN | ADA | REVIEW | Approved | |
| 01/24/2011 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET T1.0; CODE REVIEW (ALLOWABLE AREA): IS THE NOTE "NO CHANGE TO EXISTING EXITING OR OCCUPANCY" CORRECT? THERE ARE NEW OCCUPANTS FROM THE ADDED AREA. VERIFY. 2. SHEET T1.1 (SITE CODE PLAN); SHEET A2.1 (PLAN NOTE): NOTE ON A2.1 INDICATES 1899 SF BEING ADDED TO THE WESTSIDE POLICE SERVICE CENTER. IS THAT SF INCLUDED IN THE 64,797 SF INDICATED ON T1.1? VERIFY. 3. SHEET T1.1 (SITE CODE PLAN); SHEET A2.1 (PLAN NOTE): PROVIDE AN AREA AND OCCUPANT LOAD FOR EACH NEW AREA IN THIS TI (IMPOUND LOBBY, MONEY ROOM, MECHANICAL ROOM) AND INDICATE THE TOTAL OCCUPANT LOAD FOR THE WESTSIDE POLICE SERVICE CENTER. 4. SHEET T1.1; SITE CODE PLAN: PROVIDE VERBIAGE ON THE DRAWINGS FOR THE EXISTING LOCATION OF A HIGH/LOW OR SINGLE POINT-OF-USE DRINKING FOUNTAIN. 5. SHEET A2.1; FLOOR PLAN: THERE ARE TWO DETAILS AT THE SOUTHWEST CORNER OF THE IMPOUND LOBBY THAT NEED TO BE COMPLETED. ADD THE DETAIL TO THE DRAWINGS. 6. SHEET A2.1; FLOOR PLAN: THERE IS AN INTERIOR ELEVATION AT THE EAST WALL OF THE MONEY ROOM THAT NEEDS TO BE COMPLETED. ADD THE ELEVATION TO THE DRAWINGS. 7. SHEET A2.1; FLOOR PLAN: DID NOT LOCATE A SCHEDULE OF THE BASIC CONSTRUCTION TYPE OF THE NEW WALLS. VERIFY. 8. SHEET A2.1 (FLOOR PLAN); SHEET A3.1: THERE IS A SECTION CUT THROUGH THE NEW LOBBY REFERENCED 2/A3.1. SHOULD THIS BE 1/A3.2? VERIFY. 9. SHEET A3.0; ELEVATION 3: ONE OF THE TRANSACTION COUNTERS MUST BE ACCESSIBLE PER THE 2006 IBC, SECTION 1109.12.3. VERIFY. 10. SHEET A3.0; SECTION 4: PROVIDE THE METAL STUD BRACING SIZE, SPACING, CONNECTION TO THE STUD WALL, AND CONNECTION AT THE ROOF. 11. SHEETS A3.1 AND A3.2; SECTION 1: PROVIDE THE METAL STUD BRACING SIZE, SPACING, CONNECTION TO THE STUD WALLS, AND CONNECTION AT THE ROOF. INCLUDE THE CONNECTION PLATE SIZE AND CONNECTION TO THE EXISTING ROOF STRUCTURE. 12. SHEETS A3.1 AND A3.2; SECTION 1: PROVIDE THE CONNECTION OF THE PARTITION WALLS AT THE ROOF AND THE FLOOR. 13. SHEET S2.0; FLOOR PLAN: NOTE 9 ON THE PLAN IS NOT LISTED IN THE KEYNOTES. CLARIFY. 14. SHEET S3.0; BEAM SCHEDULE: THE BEAMS IN THE SCHEDULE ARE NOT INDICATED ON THE FRAMING PLAN. REVISE. 15. SHEET S3.0; FRAMING PLAN: THE JOIST EAST OF THE SKYLIGHT HAS NO DESIGNATION (J2?). VERIFY. 16. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 01/31/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approv-Cond | |
| 02/01/2011 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 02/07/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/08/2011 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
| 02/08/2011 | SUE REEVES | REJECT SHELF | Completed |