Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: FLOODPLAIN
Permit Number - T10OT00626
Review Name: FLOODPLAIN
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/30/2010 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 03/30/2010, Mountain Vail Estates, Part G, Lots 339 thru 345 and 385 thru 501, C.A. "B" Grading Plan Comments: 1- It appears that the detention basin (between Lots 345 and 388) outlet elevation (i.e. bleed pipe) is lower than the Atterbury Wash 100-year water surface elevation, which might cause the basin not to operate properly. Show the erosion hazard setback line, on the Grading Plan, and revise the basin design to address the previously mentioned concern. 2- Show the Atterbury Wash cross section numbers on Sheet 5 of 8. 3- Revise the Wash cross section with overlapping information on Sheet 5 of 8. 4- Show the post development 100-year water surface elevations on Sheet 5 of 8. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/07/2010 | CPIERCE1 | OUT TO CUSTOMER | Completed |
04/07/2010 | SUE REEVES | REJECT SHELF | Completed |