Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T10CM03257
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/19/2010 | DAVE MANN | FIRE | REVIEW | Approved | |
11/19/2010 | RONALD BROWN | ZONING HC | REVIEW | Passed | |
11/22/2010 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
11/22/2010 | RONALD BROWN | ADA | REVIEW | Approved | |
11/22/2010 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
11/23/2010 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. For additional fee assessment, please submit a letter summarizing all the deferred submittals to the Building Official: i.e. 1. Pre Engineered Steel Structure, 2. Shade Structure 3. Vortex Spray Pad Equipment and any other elements that are to be submitted at a later date. a. Please insure that all structural foundation designs are included along with structural calculations. END OF REVIEW |
11/24/2010 | GERRY KOZIOL | WWM | REVIEW | Passed | |
12/03/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
12/03/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Sheet 9 of 34 indicates the installation of a 1" potable water line running west from the new 2" potable water line, roughly 16 feet north of the branch serving the new drinking fountain. Clarify the termination point of this pipe and its proposed use. Reference: Section 103.2.3, UPC 2006. 2. The specified drinking fountain, Haws 3500, requires a minimum flowing water pressure of 30 PSI for proper operation. Provide water pressure and water pipe sizing calculations. Reference: Section 610.1, UPC 2006. 3. Provide the model number of the proposed backflow preventer for the drinking fountain; detail 1, sheet 15 of 34, has an incomplete model number. Reference: Section 103.2.3, UPC 2006. |
12/03/2010 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide the size of the existing potable water meter and the total connected water demand that will result from the addition of this activity. Reference: Sections 610.1 and 610.2, UPC 2006. |
12/06/2010 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Denied | PLEASE PROVIDE A SCHEMATIC FOR THE PUMP 1 AND PUMP 4 INTERLOCK (PP E6) |
12/16/2010 | TERRY STEVENS | ZONING | REVIEW | Denied | Approval of the site plan is required prior to approval of the building plan. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/05/2011 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
01/05/2011 | SUE REEVES | REJECT SHELF | Completed |