| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/12/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PREVIOUS COMMENT 1: THERE ARE WALL ELEMENTS 17 THROUGH 25 IN THE CALCULATIONS THAT ARE NOT SHOWN ON THE KEY PLAN (THESE ARE PART OF A STRUCTURAL FRAME). PROVIDE LOCATIONS. 2. SHEET S101B; FOUNDATION PLAN: COMPLETE THE SECTION CUT ON GRID 8.9 NORTH OF GRID W. 3. SHEET S110; FOUNDATION PLAN: COMPLETE THE SECTION CUT ON GRID 9 BETWEEN GRIDS T AND U. 4. STRUCTURAL CALCULATIONS; GRAVITY COLUMN DESIGN SUMMARY: COLUMNS AT S-4 AND S-6 ARE LISTED IN THE CALCULATIONS AS W10X49, WHILE THE DRAWING INDICATES W12X65. ARE THE FOOTINGS AT THOSE LOCATIONS DESIGNED FOR THE LOAD INDICATED IN THE CALCULATIONS? VERIFY. 5. STRUCTURAL CALCULATIONS; GRAVITY COLUMN DESIGN SUMMARY: THE CALCULATIONS INDICATE A COLUMN AT R-8, WHILE THE DRAWING INDICATES NO COLUMN OR FOOTING. VERIFY. 6. STRUCTURAL CALCULATIONS; GRAVITY COLUMN DESIGN SUMMARY: THE CALCULATIONS INDICATE A COLUMN AT Q-8, WHILE THE DRAWING INDICATES NO COLUMN OR FOOTING. VERIFY. 7. STRUCTURAL CALCULATIONS; GRAVITY COLUMN DESIGN SUMMARY: THE CALCULATIONS INDICATE A COLUMN AT P-8, WHILE THE DRAWING INDICATES NO COLUMN OR FOOTING. VERIFY. 8. STRUCTURAL CALCULATIONS; OFFICE/ANNEX COLUMN FOOTINGS: THE CALCULATIONS PROVIDE FOOTING DESIGNS AT TWO COLUMNS ONLY (Q-4 AND A-4). PROVIDE ALL COLUMN FOOTING DESIGN CALCULATIONS. 9. GENERAL: IN MANY LOCATIONS ON THE DRAWINGS, REVISION CLOUDS COVER INFORMATION. ADJUST THE CLOUDS SO ALL INFORMATION CAN BE CLEARLY READ. 10. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 11/16/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The underground plumbing plans for areas A, B, and C do not have sufficient information to determine if the pipe sizes are correct or to determine how the future fixtures that are to be roughed-in at floor level (e.g. floor drains) are to be vented. Provide a list of the abbreviations used on the plumbing plans. Reference: Section 103.2.3, UPC 2006. 2. Provide information to show that the standpipe waste detail (3/P801) complies with Sections 411.1 and 804.1, UPC 2006. 3. An approved 2-way cleanout fitting is a single, listed fitting, not a field-assembled group of individual fittings (detail 8/P801). Reference: Sections 707.4 and 707.11, UPC 2006. 4. Provide the rim elevation of the next upstream sanitary manhole and the first floor elevation. Determine the need for a backwater valve per Section 710.1, UPC 2006, as amended by the City of Tucson. 5. The flammable waste interceptor is to be connected to all necessary floor drains in the vehicle repair, storage, and testing areas. Clarify how the flammable liquid interceptor drains and vents are to be isolated from the sanitary waste and vent system in the building. Reference: Section 1017.1, UPC 2006. 6. Provide the calculations used to determine the size of the flammable liquid separator and include the dimensions of the flammable liquid separator on the drawing (detail 6/P801). Reference: Sections 103.2.3 and 1017.1, UPC 2006. 7. Provide for separate venting of the sewer-side of the flammable liquid separator. Reference: Section 1017.1, UPC 2006. |
| 11/19/2010 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approved | |
| 11/19/2010 | RICHARD JIROUDEK | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 11/22/2010 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: QIP Foundation Only T10CM02391 Foundation Plan (2nd Review) TRANSMITTAL DATE: November 22, 2010 1. The foundation plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. The building plan has been reviewed by Zoning Review Section and the plans appear to be approvable but due to the amount of comments by other PDSD agencies Zoning will not stamp and approve the plans at this time. 2. Once an approvable set of drawings is submitted Zoning will approve the plans. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t10cm02391.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/01/2010 | CPIERCE1 | OUT TO CUSTOMER | Completed |
| 12/01/2010 | SUE REEVES | REJECT SHELF | Completed |