Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T10CM02085
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/11/2010 | MARTIN BROWN | FIRE | REVIEW | Approved | |
08/16/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. STRUCTURAL CALCULATIONS; PAGE 1: UNDER 'LATERAL LOADS (WIND LOADS) THE 2003 IBC IS REFERENCED. REVISE TO THE 2006 IBC AND REVIEW CALCULATIONS FOR CONFORMANCE TO THAT CODE. 2. SHEET S1 (SECTION 1); STRUCTURAL CALCULATIONS (PAGE 4): THE STRUCTURAL CALCULATIONS INDICATE THE REINFORCING IN THE BOTTOM SLAB OF THE WET WELL TO BE #5 AT 10" EW TOP AND #5 AT 12" EW BOTTOM, WHILE THE SECTION 1 INDICATES #5 AT 12" EW TOP AND BOTTOM. CLARIFY. 3. SHEET S1; SECTION 1: THE PRECAST WET WELL WALLS WILL BE A DEFERRED SUBMITTAL. ALL DEFERRED SUBMITTALS MUST BE APPROVED IN WRITING BY LEERAY HANLY BEFORE THOSE SUBMITTALS WILL BE REVIEWED (LEERAY.HANLY@TUCSONAZ.GOV). 4. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
08/23/2010 | ROBERT SHERRY | WATER | REVIEW | Approved | |
08/23/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
08/23/2010 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approved | |
08/24/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
08/30/2010 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
09/09/2010 | GERRY KOZIOL | WWM | REVIEW | Denied | 1. NEEDS WW DESIGN REVIEW OF LIFT STATION 3RD FLOOR BY KURT STEMM 740-6607 |
09/13/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/16/2010 | DELMA ROBEY | OUT TO CUSTOMER | Completed |