Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T10CM01088
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/23/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PROVIDE HIGH/LOW DRINKING FOUNTAIN OR SINGLE POINT OF USE WATER DISPENSER PER IBC TABLE 2902.1. |
| 04/23/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide Type I hood for the range in the break room. 2. Show that the restroom exhaust fans are operating when the building is occupied. 3. Terminate the AC condensate drains in an approved location (i.e. not in a different suite). |
| 04/23/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project: T10CM01088 5925 E Broadway Denied for Electrical, following required. 1. 2006 IECC Lighting Budget Calculations needed. 2. Circuits OB 3 and 6 found in panel, not on power plan. 3. No maintenance receptacles for AC equipment on roof. 4. Homerun OB 7 should be #10. Ray T Majuta, PDSD, City of Tucson, Elect Pln Review, 4/23/10, 520-837/4988 |
| 04/23/2010 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 04/23/2010 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 04/23/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Clarify the waste and vent riser diagram. 2. Show how the water temperature for the lavatories is limited to 110 degrees Fahrenheit. 3. Provide a termination point for the water heater T&P relief located in the tenant space or the exterior of the building. 4. The first 8 feet of CW and HW for a water heater shall be insulated if the water heater does not have integral heat traps. |
| 04/23/2010 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
| 04/23/2010 | ERIC NEWCOMB | ZONING HC | REVIEW | Denied | 1. SEE BUILDING COMMENT. |
| 04/27/2010 | CAGUILA1 | WWM | REVIEW | Needs Review | |
| 04/27/2010 | CAGUILA1 | ZONING | REVIEW | Needs Review | |
| 04/27/2010 | CAGUILA1 | ENGINEERING | REVIEW | Needs Review | |
| 04/27/2010 | CAGUILA1 | FIRE | REVIEW | Needs Review |