Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T10CM00944
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/09/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | The proposed gas-fired radiant heaters have a required clearance from combustibles of 17" on top, 46" in front, 8" in back, and 46" on the bottom. Considering the second floor has a ceiling height of only 96" and a width of 116", how will pedestrians be protected from the radiant heaters? Reference: Sections 106.3.1 and 912.2, IMC 2006. |
06/09/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a cleanout at the base of each rainwater leader before it connects to a horizontal drain. Reference: Section 1101.12.2, UPC 2006. 2. Short radius quarter-bends are not allowed for use in rainwater drainage systems. Reference: Sections 706.4 and 1101.3, UPC 2006. 3. Coordinate the size of the sump pump discharge as shown in detail 3/P1.2 and pump specifications. Reference: Section 103.2.3, UPC 2006. 4. Revise the connection of the sump pump discharge to the horizontal drain line per Sections 710.4 and 1101.6, UPC 2006. 5. Provide calculations to show that the proposed sump pump system is capable of accommodating the drainage flow from a storm with a 60-minute duration and a 100-year return period (i.e. 3" per hour or 0.031 GPM/square foot). Reference: Sections 103.2.3 and 1101.11.0, UPC 2006. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/09/2010 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
07/09/2010 | SUE REEVES | REJECT SHELF | Completed |