Permit Number: T10CM00475
Parcel: 12510003G

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T10CM00475
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/26/2010 DAVE MANN FIRE REVIEW Approved
03/02/2010 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. On sheet A-1.0 please show the lavatories in the toilet rooms.
2. As per City of Tucson development standard requirements, the minimum font size is 3/32" in height, both upper and lower case. There are approximately 11 sheets that do not comply with this requirement. Please resubmit all sheets with the minimum font size of 3/32".
3. Sheet A-4.3
a. Genfric code details are not acceptable. Please include all accessibility requirements and dimensions on the actual toilet elevations.
b. Please add the vertical grab bar to the side water closet toilet elevations, men and women.
4. Please provide structural details and calculations for the roof top mounted HVAC units.
END OF REVIEW
03/02/2010 RONALD BROWN ZONING HC REVIEW Denied Please reference Building Comments.
03/08/2010 RMYERS1 WATER REVIEW Denied 1. Revise the site drawing to show the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference Section 103.2.3, UPC 2006.
03/08/2010 RICK MYERS PLUMBING-COMMERCIAL REVIEW Denied 1. Provide a watertight pan of corrosion-resistant material under the water heater with a drain to an approved location. Reference: Section 508.4, UPC 2006.
2. Show how the termination point of the water heater flue complies with Section 510.6.2, UPC 2006 (i.e. terminates at least 2 feet above any point on the roof within 10 feet of the flue).
3. Revise the detail of the "Ariston GL6" water heater installation (1/P-3.0), to include the excess pressure relief, expansion tank, vacuum relief, and valves. Reference: Sections 103.2.3, 605.5, 608.3, and 608.7 UPC 2006.
4. Revise the location of the expansion tank for water heater P2 so that it cannot be valved off from the water heater. Reference: Section 608.3, UPC 2006.
5. Modify the trap arm lengths for the floor sinks located in Prep Area, adjacent to exterior wall, to conform to Table 10-1, UPC 2006 (a 3" trap arm may have a developed length of only six feet from the trap weir to the inner edge of the vent). Reference: Section 1002.2, UPC 2006.
6. Include how the domestic water system is to be sterilized. Reference:
609.9 2006 UPC.
7. See sheet P-3.0 detail 3, waste and vent riser diagram: clarify branch pipe size, as identified on the Fixture Branch Schedule on P-2.0, by noting branch piping size on detail 3, sheet P-3.0.
8. See Fixture Unit Schedule on P-2.0. Schedule shows ten floor sinks for a total of twelve drainage fixture units. Correct DFU fixture count.
9. Revise the location of the automatic fuel shutoff valve for the gas-fired appliances located under the type I hood. It is currently shutting off gas service only to the water heater (P2). Reference: Section 904.3.3, IFC 2006.
10. The Watts 70A temperature mixing valve is not listed for use as a scald prevention valve. Select a valve that is appropriately listed, e.g. ASSE 1016 or ASSE 1070. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006.
11. Correct detail 9/P-4.0: provide separate indirect waste pipes for the ice maker and the ice storage bin. Reference: Section 801.2.3, UPC 2006.
03/08/2010 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied Project: T10CM00475, 3587 E Broadway BL.
Panda Express

The electrical plans denied for the following:
1. As per City of Tucson Development Standards, minimum font size required is 3/32", upper and lower case.
2. Provide 2006 IECC Interior Budget Lighting Calculations.

Ray T Majuta, Elect Pln Exam,
PDSD, City of Tucson
3/9/10,
520/8374988
03/09/2010 GERRY KOZIOL WWM REVIEW Approved
03/15/2010 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units not included in the shell package structural calculations (e.g. Pollution Control Unit and condensing units). Reference: Section 302.1, IMC 2006.
2. Verify that the installation of the Pollution Control Unit (EF-1) will be installed per the manufacturer's instructions (e.g. is the length of straight inlet duct equal to five times the equivalent duct diameter). Reference: Section 304.1, IMC 2006.
3. Show the size, routing, and termination of the condensate drain for AC-3 and the equipment drain for MA-1. Reference: Section 307.2, IMC 2006 and Section 814.0, UPC 2006.
4. Provide information on the sequence of operation for the restroom exhaust fans to show that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (3), IMC 2006.
5. Provide calculations to show that the common ventilation system is sized in accordance with Section 403.3.2, IMC 2006.
6. Clarify how the Pollution Control Unit discharge complies with the requirements of Sections 506.3.12 and 506.5, IMC 2006.
7. Provide structural calculations and details to show that the Type I hood is supported from the building structure in accordance with Section 507.6, IMC 2006. The details on sheet M-3.0 do not show how the hood is to be attached to the existing steel trusses. Reference: Section 302.1, IMC 2006.
8. The Pollution Control Unit has 1-1/2" NPT drains for each of its modules; clarify how disposal of any waste water from maintenance operations will accomplished. Reference: Sections 106.3.1 and 304.1, IMC 2006.
9. Show how the horizontal grease duct is to be supported. Reference: Section 506.3.3, IMC 2006.
10. Show the locations of the cleanouts for the grease duct on the roof. Reference: Sections 506.3.8 and 506.3.9, IMC 2006.
11. Revise the AC Control Wiring Diagram (M-2.0) to show the smoke detectors in the return air duct. Reference: Section 606.1, IMC 2006.
05/25/2010 JASON GREEN ENGINEERING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
03/17/2010 CPIERCE1 OUT TO CUSTOMER Completed
03/17/2010 SUE REEVES REJECT SHELF Completed