Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T10CM00311
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/11/2010 | RONALD BROWN | ADA | REVIEW | Passed | |
06/14/2010 | DAVE MANN | FIRE | REVIEW | Denied | Fire Comments: Sheet 3 Door 9 requires panic hardware per IFC Section 1008.1.9. |
06/15/2010 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
06/18/2010 | RONALD BROWN | ZONING HC | REVIEW | Approved | |
06/18/2010 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Please provide a scaled plan of the existing building floor plan showing demolition as well. a. Please identify all the rooms b. Please provide an occupancy load calculation of the existing facility prior to the classroom additions and modifications. 2. Please provide completed Special Inspection Certifications for the following: a. Epoxy Anchors b. Expansion anchors c. Anchor bolts in concrete d. Structural masonry and any others deemed necessary by the Structural Engineer. 3. At Sheet 3, what is Note number 8 in the kitchen all about? This is not shown in structural drawings. 4. Provide panic hardware at all exist doors as required by section 1008.1.9. 5. All sheets that have lettering smaller tham 3/32" must be revised and resubmltted to meet the minimum font size requirement. END OF REVIEW |
06/22/2010 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/23/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide energy code compliance calculations (Pima County < 4,000 feet). Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. 2. Show how the fan coil is connected to the building structure and how maintenance access will be provided to the fan coil (the fan coil appears to be bisected by the partition support shown in detail 1 on sheet 6). Reference: Sections 302.1 and 306.1, IMC 2006. 3. Show the routing and termination of the condensate drains for the fan coil and the ductless heat pump. Reference: Section 307.2, IMC 2006 and Section 814.0, UPC 2006. 4. Clarify how and to where the auxiliary drain pan for the fan coil unit will be drained. Reference: Section 307.2.3 IMC 2006. 5. Provide calculations demonstrating adequate ventilation for the enlarged classroom. Reference: Section 401.2, IMC 2006. 6. Clarify if the kitchen shown on the plans is existing or a replacement for the kitchen being removed on the east side of the building. If the kitchen is new, a Type I grease hood will be required over the range. Reference: Section 507.2.3, IMC 2006. 7. Provide a smoke detector in the return air duct for the fan coil unit, up stream of any outside air connections. Reference: Section 606.1, IMC 2006. |
06/23/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a complete plumbing plan, including waste and vent isometrics. Reference: Section 103.2.3, UPC 2006. 2. Indicate the materials to be used in the proposed plumbing systems for this activity. Reference: Sections 103.2.3, 301.1, 604.0, 701.0, 903.0, 1102.0, and 129.5, UPC 2006. 3. Verify that the materials used for the drainage piping in the area of the new classroom are approved for use under the new building addition. Reference: Section 313.4, UPC 2006. 4. Verify the location of the initial cleanout for the existing building sewer and show how it is to be extended to the finished floor grade in the new addition. Reference: Sections 719.1 and 719.3, UPC 2006. 5. Show the plumbing fixtures and drainage fittings installed correctly and in a manner consistent with the Code and the manufacturer's instructions. Reference: Sections 304.0 and 310.4, UPC 2006. 6. All plumbing fixtures and fittings shall be listed or labeled by a nationally-recognized, accredited conformity assessment company (e.g. NSF, UL, ETL, UPC, etc). Reference: Section 301.1.1, UPC 2006. |
06/25/2010 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approved | |
06/28/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
06/30/2010 | GERRY KOZIOL | WWM | REVIEW | Approved | |
07/07/2010 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |