Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T10BU01146
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/29/2010 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: OReilly Auto Parts T10BU01146 Grading Plan (1st Review) TRANSMITTAL DATE: July 29, 2010 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not approve the grading plan until the site plan has been approved. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next grading plan submittal. 3. Zoning will re-review the grading plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t10bu01146 RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Grading plan and a copy of the approved site plan |
| 08/02/2010 | ANDREW CONNOR | NPPO | REVIEW | Denied | Commercial Rainwater Harvesting Development Standard 10-03.0 applies to all commercial development plans Submitted after June 1, 2010. Submit a Rainwater Harvesting Plan Per DS 10-30.4.2.A. Ensure that all Engineering comments and concerns are addressed. Additional comments may apply |
| 08/12/2010 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | August 16, 2010 T10CM02007 T10BU01146 O'Reilly Auto Parts Site and Grading Plan Review Provide a local benchmark and basis of elevation. The temporary benchmark provided is clearly from a different project. There is a FEMA Floodplain Zone AE along Arcadia Avenue. Provide the delineation for the floodplain and water surface contours. A contour should be provided at the upstream corner of the building. The contour elevation should be in the same datum as the local benchmark. Provide adequate freeboard for the lowest floor of the proposed retail store above the adjacent floodplain elevation. Add a note to the site plan to indicate that a floodplain use permit will be required for all work within the floodplain. This includes all improvements in the right-of-way along Arcadia Avenue. Provide all of the applicable elements of the site plan development standard (DS 2-02). Since this plan is also serving as the grading plan, provide sufficient detail to complete the grading of the project. Provide construction details or specifications for sidewalks, curbs, pavement, parking blocks and other features. Remove the erosion and sediment controls from the site/grading plan. These may be included but must be separate from the site and grading plans. Add a note to indicate that all work in the right-of-way will require a separate right-of-way permit. Revise the solid waste container enclosure to provide an angle suitable for the solid waste vehicle to service the container. Also provide construction details and dimensions for the enclosure. The enclosure should provide a 10 by 10 clear area for the dumpster with bollards protecting the side and rear walls. Additional comments may be forthcoming once a complete site plan and grading plan are submitted. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/26/2010 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 08/26/2010 | SUE REEVES | REJECT SHELF | Completed |