Plan Number: T09PI00018
Parcel: Unknown

Review Status: Completed

Review Details: PIA SUBMITTAL

Plan Number - T09PI00018
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/27/2009 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved
11/02/2009 RICHARD LEIGH DOT ENGINEERING REVIEW Denied November 2, 2009

SUBJECT: Sierra Morado - Unit 4, Phase 2, Public Improvements, PIA T09PI0018

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal.

1. Include the plan number "I-2009-035" in title block of each sheet.

2. Include Development Services Department PIA activity number "T09PI00018"on cover sheet.

3. Provide roadway centerline and curve data.

4. Sidewalk lateral transition shall not be sharper than three longitudinal to one lateral per D.S. 3-01.3.3.

5. Sheet, Key Note 5: Provide a driveway entrance per Standard detail 206.

6. Sheet 7: Show sidewalk and curb access ramps in plan view.

Refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov
11/03/2009 RLEIGH1 UTILITY CLEARANCES COT STREETS DIVISION Approved
11/03/2009 GARY WITTWER DOT LANDSCAPE REVIEW Approv-Cond Submit the approved site NPPO plan, and irrigation plan for common areas. (no irrigation lines under public roads)
11/03/2009 RLEIGH1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Approved
11/03/2009 RLEIGH1 UTILITY CLEARANCES PC WASTEWATER MGMT Approved
11/03/2009 RLEIGH1 UTILITY CLEARANCES QUEST COMMUNICATION Approved
11/03/2009 RLEIGH1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Approved
11/03/2009 RLEIGH1 UTILITY CLEARANCES COX COMMUNICATION Approved
11/03/2009 RLEIGH1 UTILITY CLEARANCES SOUTHWEST GAS CORP Approved
11/03/2009 RLEIGH1 UTILITY CLEARANCES EL PASO NATURAL GAS Approved
11/03/2009 RLEIGH1 UTILITY CLEARANCES KINDER MORGAN ENERGY Approved
11/09/2009 JOSE ORTIZ DOT TRAFFIC REVIEW Denied November 9, 2009
ACTIVITY NUMBER: T09PI00018
PROJECT NAME: Sierra Morado-Unit4-Phs2
PROJECT ADDRESS: Sierra Morado
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan.

1. Include a response letter with the next submittal that states how all comments have been addressed.

2. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes.

3. Install street names at all proposed roadway intersections within this development including public to private roadway intersections per PCDOT & TDOT Signing Manual (2002) Chap 5-11, 5-12, and Chap 9-2.

4. Show no parking signs where there is to be no parking. Provide a detail of the No Parking sign to be used.

5. Place the PIA and CDRC Case number on the cover sheet.



If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov
11/17/2009 RICHARD LEIGH PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
11/17/2009 RICHARD LEIGH PIA COORDINATOR OUT TO CUSTOMER Completed