Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T09PI00018
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/27/2009 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
11/02/2009 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | November 2, 2009 SUBJECT: Sierra Morado - Unit 4, Phase 2, Public Improvements, PIA T09PI0018 PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. 1. Include the plan number "I-2009-035" in title block of each sheet. 2. Include Development Services Department PIA activity number "T09PI00018"on cover sheet. 3. Provide roadway centerline and curve data. 4. Sidewalk lateral transition shall not be sharper than three longitudinal to one lateral per D.S. 3-01.3.3. 5. Sheet, Key Note 5: Provide a driveway entrance per Standard detail 206. 6. Sheet 7: Show sidewalk and curb access ramps in plan view. Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
11/03/2009 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Approved | |
11/03/2009 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approv-Cond | Submit the approved site NPPO plan, and irrigation plan for common areas. (no irrigation lines under public roads) |
11/03/2009 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Approved | |
11/03/2009 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Approved | |
11/03/2009 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Approved | |
11/03/2009 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Approved | |
11/03/2009 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Approved | |
11/03/2009 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Approved | |
11/03/2009 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Approved | |
11/03/2009 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Approved | |
11/09/2009 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | November 9, 2009 ACTIVITY NUMBER: T09PI00018 PROJECT NAME: Sierra Morado-Unit4-Phs2 PROJECT ADDRESS: Sierra Morado PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. 1. Include a response letter with the next submittal that states how all comments have been addressed. 2. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes. 3. Install street names at all proposed roadway intersections within this development including public to private roadway intersections per PCDOT & TDOT Signing Manual (2002) Chap 5-11, 5-12, and Chap 9-2. 4. Show no parking signs where there is to be no parking. Provide a detail of the No Parking sign to be used. 5. Place the PIA and CDRC Case number on the cover sheet. If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
11/17/2009 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
11/17/2009 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed |