Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T09PI00014
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/22/2009 | TAMI HAUSER | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS |
05/22/2009 | TAMI HAUSER | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS |
05/22/2009 | TAMI HAUSER | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS |
05/22/2009 | TAMI HAUSER | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS |
05/22/2009 | TAMI HAUSER | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS |
05/22/2009 | TAMI HAUSER | UTILITY CLEARANCES | COX COMMUNICATION | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS |
05/22/2009 | TAMI HAUSER | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS |
05/22/2009 | TAMI HAUSER | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS |
05/22/2009 | TAMI HAUSER | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS |
05/27/2009 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | 1. Please submit a copy of your approved NPPO. 2. Please submit a copy of your planting and irrigation plans for the CA's. I am looking to see that no private irrigation lines cross public roadways. If they do, you will need to get a legal easement to cross the road. |
05/29/2009 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | Pg.10: Minimum size 24" RCP; show dimension of grouted rock riprap. Pg. 11: show toe down & dimension. No comments from Landscape maintenance. |
06/15/2009 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | June 15, 2009 SUBJECT: Sunnyside Pointe, Lots 22-31, 60-120, 141-144, 186-202 Public Improvements, PIA T09PI0005 PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. 1. Include the plan number "I-2009-019" in the title block of each sheet. 2. Include Development Services Department PIA activity number "T09PI00014" on cover sheet. 3. Place index map on cover sheet. 4. Submit approved tentative plat showing phasing of project or correspondence from the COT Development Service Department approving the proposed phasing of project and waving of the sidewalk requirement along 1st Avenue. 5. Private drainage easements will have to be obtained for all private storm drains crossing the public rights-of-ways. Delineate all easements and provide recordation information in plan views. 6. Provide a minimum 42' pavement radius at the temporary turnaround at the end of Hammer Lane. If a curb will not be provided, an 8' graded shoulder with a maximum 2% cross slope will be required along turnaround with the access barrier placed beyond the graded shoulder. Additionally, a temporary public access easement will have to be provided for the turnaround. 7. Provider pavement or rock rip-rap to encompass area in front of basin 3 inlet. This area will need to be armored to prevent scouring. 8. If a curb will not be provided at the intersection of Emma Marie Street and Dorothy Day Lane, an 8' graded shoulder with a maximum 2% cross slope will be required along turnaround with an access barrier placed beyond the graded shoulder. 9. Have the proposed drainage structures within the Old Nebraska Wash been designed to withstand the 100 year flood conditions? Provide complete details for all drainage structures. Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
06/18/2009 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | June 18, 2009 ACTIVITY NUMBER: T09PI00014 PROJECT NAME: Sunnyside Pointe PROJECT ADDRESS: 5145 S 1st Avenue PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. 1. Include a response letter with the next submittal that states how all comments have been addressed. 2. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes. 3. When applicable install W14-2a (No Outlet) or W14-1a (Dead End) plaque beneath the street name signs. 4. Install R2-1 (25MPH Speed Limit Sign) along Robert Hansen Drive entering this development off of Park Avenue per PCDOT & TDOT Signing Manual (2002) Chap 9-10. 5. Show "No Parking" signs in the temporary cul-de-sacs. 6. Place the PIA and CDRC Case number on the cover sheet. If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
07/22/2009 | TAMI HAUSER | PIA COORDINATOR | CUSTOMER CALLED | Completed | |
07/22/2009 | TAMI HAUSER | PIA COORDINATOR | OUT TO CUSTOMER | Completed |