Address: 5145 S 1ST AV
Date - 11/22/2024 12:26 a.m.
Total Number Of Permits - (9)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
DP12-0143 | Complete | 08/28/2012 | 02/04/2018 | Development Package | TENTATIVE PLAT - SUNNYSIDE POINTE (1-267) | |
T06AN00862 | ISSUED | 08/16/2006 | N/A | ADDRNEW | ||
T06BU02336 | WITHDRWN | 09/25/2006 | N/A | GRADING | SUNNYSIDE POINTE GRADING:34611CY CUT 27993CY FILL | |
T08BU00412 | WITHDRWN | 03/03/2008 | N/A | GRADING | GRADING: SUNNYSIDE POINTE 35988CY CUT 31911CY FILL | |
T09BU00377 | FINAL | 03/13/2009 | 01/15/2022 | GRADSWPP | GRADING:35,988CY CUT & 31,911CY FILL | |
T09EX00386 | CLOSED | 07/08/2009 | 09/06/2009 | EXCAV | EXC OF 28' IN PAVEMENT FOR SEWER | |
T09EX00543 | CLOSED | 09/23/2009 | 05/21/2010 | EXCAV | EXCAVATIONS OF 140' IN 1ST AVE PAVEMENT FOR WATER TIE IN. 24' FOR UTILITIES IN 1ST AV. 155' FOR UTILITIES IN PARK AV. 20' IN PARK IN DIRT FOR UTILITIES. THE EXCAVION OF 42' INTO PARK PAVEMENT FOR WATER TIE IN IN BIKE LANE. | |
T09OT02292 | ISSUED | 10/27/2009 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT | |
T12EX00499 | CLOSED | 09/18/2012 | 11/17/2012 | EXCAV | INST 504LF OF 8" WATER LINE PER TW PLAN NO. 2-110-2009 WITHIN 1ST AVE NORTH OF CALLE BAYONA. TYPE B T TOP PAVEMENT PATCH REQUIRED FOR TRENCHES UNDER 4'WIDE |
Plans
Address: 5145 S 1ST AV
Date - 11/22/2024 12:26 a.m.
Total Number Of Plans - (4)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T08PI00010 | WITHDRWN | 03/06/2008 | N/A | PAVING -- 205 | SUNNYSIDE POINTE | |
T08PI00016 | FINAL | 03/31/2008 | N/A | PAVING & SEWER -- 200 | SUNNYSIDE POINTE - PARK AVENUE | |
T09PI00014 | FINAL | 05/19/2009 | N/A | PAVING & SEWER -- 200 | SUNNYSIDE POINTE | |
T15PI00021 | CLOSED | 09/28/2015 | 02/10/2021 | PAVING -- 205 | SUNNYSIDE POINTE, LOTS 1-21, 121-140, 145-157, 161-166, 171-185 Offsite Improvement plans for the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on City of Tucson approved plan I-2015-016 (all in accordance with Pima County/City of Tucson Standards and Specifications and Details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson Standards and Specifications. Any required special inspection shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson Department of Transportation, Permits and Codes Section, for review prior to start of construction. |