Permit Number: T09CM03255
Parcel: 104061830

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T09CM03255
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/10/2010 RONALD BROWN BUILDING-COMMERCIAL REVIEW Approved
03/11/2010 RONALD BROWN ZONING HC REVIEW Denied Previous Review Comment:
1. Provide for proper mounting heights and dimensions for all toilet fixtures and accessories as per 2206 IBC, Chapet 11 and ICC (ANSI) 117.1, Chapter 6.
RESUBMITTAL COMMENTS:
1. Vertical Grab Bar is shown incorrectly. Please redesign and comply with ICC (ANSI) 117.1, Section 604.5.1.
2. Generic details copied from the code book are not acceptable. Please show all critical accessible requirements, dimensions and etc. on actual toilet elevations.
03/16/2010 DAVID RIVERA ZONING REVIEW Denied Zoning cannot approve the building plans until the site plan is approved.
03/22/2010 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
03/22/2010 ROBERT SHERRY WATER REVIEW Approved
03/22/2010 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Comment not addressed. Provide the minimum plumbing facilities required by Table 2902.1 and Section 2902.2, IBC 2006, for a factory and industrial occupancy.
2. Revise the submitted water pressure calculations. The water calculations shall be based on the minimum daily service pressure; 55 PSI in this case. Correct the required static lift (elevation loss): the water meter appears to be located at about 2274 feet, the FFE is 2278.75 feet, and the highest water outlet (for the evaporative cooler) is about 11 feet above the FFE for a total lift of about 15.75 feet. Include the minimum required residual water pressure; the specified water closet requires a minimum pressure of 25 PSI. Reference: Section 610.1, UPC 2006.
3. Provide an upper terminal cleanout for the water closet, sized per Section 707.11, UPC 2006. Reference: Section 707.4, UPC 2006.
4. Provide cleanouts in the building sewer at intervals not exceeding 100 feet, sized per Section 707.11, UPC 2006. Reference: Section 719.1, UPC 2006.
5. Comment not addressed. Provide vent piping of sufficient size to comply with Section 904.1, UPC 2006.

Final Status

Task End Date Reviewer's Name Type of Review Description
03/29/2010 DELMA ROBEY OUT TO CUSTOMER Completed
03/29/2010 SUE REEVES REJECT SHELF Completed