Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T09CM02912
Parcel: 10503032F

Address:
5055 N ORACLE RD

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T09CM02912
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/06/2009 GERRY KOZIOL WWM REVIEW Approved
11/09/2009 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET A0.0: SHEET INDEX DOES NOT INCLUDE SHEET A3.7. REVISE.
2. SHEET A0.0: SHEET INDEX DUPLICATES SHEET P5.1. REVISE.
3. SHEET A0.0: SHEET INDEX DOES NOT INCLUDE SHEET E0.0 (DUPLICATES SHEET E0.1). REVISE.
4. GENERAL: A MINIMUM OF 3/32" TALL LETTERING IS REQUIRED ON ALL DRAWINGS. REVISE SHEETS A0.2, A2.7, AND A6.2).
5. GENERAL: IT APPEARS SOME OF THE NEW RTU'S, EF'S, AND MAU'S ARE HEAVIER THAN ORIGINAL UNITS, OR ARE NEW ADDITIONS WHERE NO UNIT WAS PREVIOUSLY PLACED. PROVIDE CALCULATIONS TO VERIFY THAT THE EXISTING STRUCTURE IS CAPABLE OF SUPPORTING ALL NEW UNITS.
6. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
11/12/2009 ERIC NEWCOMB ZONING HC REVIEW Approved
11/23/2009 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied Project : 5055 N Oracle Rd
T09CM02912, Restaurant
The Good Egg


The Electrical Plans have been denied for the following:
1. Commercial Submittal Requirements,------ plans to be drawn to a minimun text size of at least 3/32'' all uppercase.
Some items will not be able to be recorded.
2. Sheet E2.0, under Exterior Lighting Notes, # 5 , it is not stated how many 100 MH fixtures were removed compared to 10 type K fixtures installed.
3. Sheet E1.1, provide interlocking diagrams for General Note # 3, and Keynotes #'s 4,5,and 6.

Ray T Majuta
Elect Plan CK
DPDS,City of Tucson
11/24/09
Ray.Majuta@tucsonaz.gov
12/03/2009 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide material standards for all plumbing fixtures being installed. All plumbing fixtures and fittings shall be listed or labeled by a nationally-recognized, accredited conformity assessment company (e.g. UL, ETL, UPC, etc). Reference: Sections 301.1.1 and 401.1, UPC 2006.
2. Clarify the insulation ambiguity caused by General Plumbing Note 12 and the insulation requirement in the Pipe Material Schedule on sheet P0.1. Insulation is required for circulating hot water piping per Section 504.5, IECC 2006.
3. Revise the water pressure calculations to include the pressure drop due to the water softener (shown only on sheet P4.2). Reference: Section 610.2, UPC 2006.
4. Provide a direct waste connection for the wash and rinse sections of the 3-compartment sink, with an indirect connection for the sanitizing compartment only. Reference: Sections 304.0 and 801.2.3, UPC 2006.
5. Provide calculations to justify the size of the expansion tank for the water heater. Reference: Sections 301.1.3 and 608.3, UPC 2006.
6. Show the vent size and height for the new water heater. Show that the termination of the vent for the water heater complies with the requirements of Section 510.6.2, UPC 2006.
12/03/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units AC-2, AC-3, MAU-1, and MAU-2. Reference: Section 302.1, IMC 2006.
2. Revise the size of the common condensate drain from the walk-in freezer and walk-in cooler in accordance with Section 307.2.1, IMC 2006, as amended by the City of Tucson.
3. The occupant load used to calculate the required ventilation is not necessarily the same as the occupant load used for calculating exiting requirements. The occupant load used for calculating the minimum required ventilation is to be based on Table 403.3, IMC 2003 or an approved engineering analysis of the specific occupancy type. Units AC-2 and AC-3 (aka HP-2 and HP-3) have significantly lower occupant loads than called for in Table 403.3. Reference: Section 403.3, IMC 2006.
4. Provide information regarding the three existing Type I hoods; e.g. size, listing information, and required exhaust and make-up airflow rates. Reference: Sections 106.3.1 and 507.1, IMC 2006.
5. Provide information to show that the operation of the Type I hoods and the hood exhaust fans complies with Section 507.2.1.1, IMC 2006.
6. Provide a design for the proposed Type II hood for the dishwasher. Reference: Sections 106.3.1, 506.4, 507.5, 507.7.2, and 507.13.5, IMC 2006. (Note that the hood is located in a different location on sheet A2.5)
7. Revise the size of the grease ducts to provide a minimum velocity of 1500 feet per minute. Reference: Section 506.3.4, IMC 2006, as amended by the City of Tucson.
8. Clarify why MAU-1 is interlocked to exhaust fans EF-1, EF-2, and EF-3 but nothing is interlocked with MAU-2. Also, why is MAU-2 not included in the Kitchen Air Balance Data chart? Reference: Sections 106.3.1 and 508.1, IMC 2006.
9. Clarify how the grease exhaust ducts are to be enclosed; provide a design for an enclosing shaft per Section 506.3.10, IMC 2006 or specify the duct wrap to be applied to the ducts.
10. Show how the terminations of the ducts from MAU-1 and MAU-2 comply with the requirements of Section 508.1.1, IMC 2006.
11. Show that the make up air duct within 18" of the Type I exhaust hood complies with the requirements of Section 506.3.1.2, IMC 2006
12. Return of air from the restrooms is prohibited by Section 918.6 (5), IMC 2006.