Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T09CM02126
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/11/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
| 08/13/2009 | ERIC NEWCOMB | ZONING HC SITE | REVIEW | Denied | 1. SEE BUILDING COMMENTS. |
| 08/13/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET G-0.3; SHEET S-1.0: CHANGE CONCRETE NOTE ON SHEET G-0.3 TO MATCH SHEET S-1.0. 2. SHEET G-0.3; SHEET S-1.0: CHANGE STEEL REINFORCING NOTE ON SHEET G-0.3 TO MATCH SHEET S-1.0. 3. SHEET A0.0; DETAIL 8: VERTICAL GRAB BAR REQUIRED PER ICC/ANSI A117.1-2003, FIGURE 604.5.1 (PER A-4.3). 4. SHEET A0.0 (DETAIL 8); SHEET A-4.3 (DETAIL 4): LOCATE TOILET PAPER DISPENSER PER ANSI, FIGURE 604.7. 5. SHEET A-0.2 (SECTION A); SHEET S-6.0 (TRASH ENCLOSURE PLAN): ARCHITECTURAL INDICATES 5" DIAMETER PIPE BOLLARD, WHILE STRUCTURAL INDICATES 4" DIAMETER. CLARIFY. 6. SHEET A-0.3 (DETAIL 11); SHEET S-6.0 (TRASH ENCLOSURE FRONT ELEVATION): ARCHITECTURAL INDICATES 18" DIAMETER FOOTING AT BOLLARD WHILE STRUCTURAL INDICATES 2'-0" DIAMETER. CLARIFY. 7. SHEET A-0.3; DETAIL 4: CITY OF TUCSON REQUIREMENT OF 7'-0" CLEAR DIMENSION FROM FINISH GRADE TO BOTTOM OF 'RESERVED PARKING' SIGN. ADD THIS DIMENSION AND ADJUST 'VAN ACCESSIBLE' SIGN. 8. SHEET A-1.0; MEN'S ROOM URINAL: VERIFY URINAL MEETS ANSI SECTION 605.3 TO BE POSITIONED FOR FORWARD APPROACH. 9. SHEET A-1.0; FLOOR PLAN: VERIFY THE VESTIBULE BETWEEN THE RESTROOMS MEETS ANSI SECTION 304.3.1 FOR TURNING CIRCLE. 10. SHEET A-1.3 (DETAIL 3); SHEET S-1.0 (DETAIL 11): COORDINATE ARCHITECTURAL AND STRUCTURAL DETAILS. 11. SHEET S-1.0; STRUCTURAL CALCULATIONS: THE CONCRETE GENERAL NOTES INDICATE THE SLAB ON GRADE CONCRETE COMPRESSIVE STRENGTH OF 3000 PSI, WHILE THE CALCULATIONS INDICATE 2500 PSI. CLARIFY. 12. SHEET S-6.0; TRASH ENCLOSURE PLAN: REVISE THE SECTION CUT 4/S-5 (NOT USED). SPECIFIY MASONRY WALL FOOTING SIZE AND REINFORCMENT. 13. GENERAL: ALL DEFERRED SUBMITTALS MUST BE APPROVED BY LEERAY HANLY. 14. GENERAL: LETTERING ON ALL SHEETS MUST BE A MINIMUM OF 3/32" IN HEIGHT (SEE SHEET S-1.0). 15. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL COMMENTS. |
| 08/13/2009 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
| 08/20/2009 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 08/25/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. See sheet P-4.0 detail nine. Cuber drain and ice bin drain may not be combined. 2. Three compartment sink to be directly connected. Indirect waste is limited to sanitizing bowl and/or vegetable prep bowl. 3. Coordinate detail twelve on sheet P-4.0, 3/4" gas supply with detail two on sheet P-3.0 which shows 11/4" gas to tankless water heater. 4. Water heater set above fixture outlets to have a vacuum relief valve. Reference 608.7 2006 UPC. 5. Show how the potable water system is to be sterilized. Reference 609.9 2006 UPC. 6. Show how the floor is to be sloped to the drains in the restrooms. Reference 411.4 2006 UPC. 7. Provide site utility plan showing continuation of sewer and water, as noted on sheet P-2.0 8. Shoe how the tankless water heater located in the attic is to be made accessible. |
| 08/25/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum of 3/32-inch (upper and lower case; shop drawings and COMcheck printouts exempted). Reference: Section 106.1.1, IBC 2006. 2. Provide energy code compliance calculations. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. 3. Clarify the construction shown in detail 3/A-1.2. Reference: Sections 106.3.1 and 507.9, IMC 2006. 4. Provide justification for using "Dining rooms" instead of "Cafeteria, fast food" for the ventilation calculations. Reference: Section 403.3, IMC 2006. 5. Revise the enclosing shaft (sheet M-3.0) for the grease duct to provide a minimum separation of 6" between the duct and the shaft. Reference: Section 506.3.10, IMC 2006. 6. Show that the "1-hour" duct wrap detail on sheet M-3.0 will comply with ASTM E 2336. Reference: Section 506.3.10 (1), IMC 2006. 7. Clearance reduction for "protected combustibles" (see sheet M-3.0) shall be per Section 308, IMC 2006. 8. Coordinate the hood designs shown on sheets M-3.0 and M-4.0 with respect to dimensions and air flow quantities. Reference: Section 106.3.1, IMC 2006. |
| 08/25/2009 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Revise the site utility plan to show the location of the reduced pressure backflow assembly on the drawings, specify the reduced pressure backflow assembly being installed, and indicate the size of the assembly. Reference: COT Ordinance 9976, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf 2. Include the location of the water meter on the site utility plan. Coordinate the water service requirements on sheet P-0.1 and the water service diagram (4/P3.0). Confirm the size of the proposed water meter; Tucson Water limits a 1" meter to a maximum demand of 25 GPM. |
| 08/28/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project: Panda Express, T09CM02126 New Restaurant The Electrical Plans have been denied for the following, 1. Sheet E2.0, the fixtures by the rear door have not been circuited, referring to the exit and outdoor lights. 2. Cannot locate circuit A-10, it is shown on panel schedule ,cannot locate on power plan. Ray T Majuta Elect Pln Ck PDS City of Tucson 8/31/09 Ray.Majuta@tucsonaz.gov |
| 08/31/2009 | GERRY KOZIOL | WWM | REVIEW | Denied | PANDA EXPRESS-ISSUED W/ GREASE INTERCEPTOR NEED PCRWRD 5TH FL CREDIT EVALUATION FOR EXSISTING BLDG DEMO- LIZ @ 740-6602 NEED CIVAL UTILITY PLAN SHOWING LOCATION/METHOD OF CONNECTION TO PUBLIC SEWER NEED PCRWRD/IWC REVIEW & APPROVAL OF GREASE INTERCEPTOR- TOM TOMCHAK- 443-6200 5025 W INA RD |
| 09/02/2009 | TERRY STEVENS | ZONING | REVIEW | Denied | 09/02/2009 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/21/2009 | CPIERCE1 | OUT TO CUSTOMER | Completed |