Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM01693
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/01/2009 | MARTIN BROWN | FIRE | REVIEW | Approved | |
07/07/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide the correct address for this tenant improvement. 2. The shell drawings for this building indicate that a backwater valve has been installed. Fixtures not located on the floor requiring a backwater valve shall not discharge through the backwater valve. Reference: Section 710.1, UPC 2006. 3. One of the specified fixtures (Water Closet, P2) requires a minimum pressure greater than the 15-PSI used in the water pipe sizing calculations (20 PSI). Revise calculations as necessary. Reference: Section 608.1, UPC 2006. 4. The submitted water pressure calculations do not support the size of water piping to the fixtures (detail 3/M8.1). Reference: Section 610.1, UPC 2006. |
07/07/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
07/07/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide the correct address for this tenant improvement. 2. Provide information on the sequence of operation for the restroom exhaust fans to show that recirculation of the air from the restrooms will not occur. Reference: Section 403.2.1, IMC 2006. |
07/08/2009 | RONALD BROWN | ZONING HC SITE | REVIEW | Denied | REFERENCE BUILDING COMMENTS |
07/08/2009 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Provide a letter for the deferral of the sprinkler system to the Building official, mr. Ernie Duarte, in care of Mr. leeRay Hanly. 2. Provide large scale plans of all the different types of toilet layouts showing all critial accessible accessories and critical dimensions showing compliance with 2006 IBC, Chapter 11 and ICC/ANSI 117.1, Chapter 6. 3. Provide toilet elevations showing showing all critial accessible accessories, finishes and critical dimensions showing compliance with 2006 IBC, Chapters 11, 12 and ICC/ANSI 117.1, Chapter 6. 4. The elevation of the reception shows an accessible counter to serve a dual function as also being the access counter top hatchway to the back side of the counter. In so many caeses of this type, later in time, the countertop hatchway is removed for ease of access to the back of the counter. Please provide a permanent section of the reception counter that is in compliance with ICC/ANSI, Section 904. 5. Please delete all details that are not relative to this project. END OF REVIEW |
07/15/2009 | GERRY KOZIOL | WWM | REVIEW | Denied | NEED TO BUILD SHELL BLDG BLOCK B - BLDG 2 NEED ADDRESSING REVIEW |
07/23/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/06/2009 | DELMA ROBEY | OUT TO CUSTOMER | Completed |