Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM01648
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/29/2009 | RONALD BROWN | ADA | REVIEW | Passed | NOT A COT OWNED/OPERATED PROPERTY |
| 06/29/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 06/29/2009 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Need structural calculations for fan coil unit 2. Need structural details and calculations for water heater support from structure |
| 06/29/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
| 06/29/2009 | RONALD BROWN | ZONING HC SITE | REVIEW | Approved | |
| 06/29/2009 | DAVE MANN | FIRE | REVIEW | Approved | |
| 06/29/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide specifications for the water heater, the floor drains, and the sinks. 2. Provide a vent for each trap. 3. Show how the temperature of the hot water to the lavatory will be limited to 110 degrees Fahrenheit or less. 4. Provide for thermal expansion of the hot water. 5. Show the size, route and termination of the temperature and pressure relief for the water heater. 6. Provide a drain pan with drain for the water heater. 7. Show how the trap primer is to be installed. 8. Specify the backflow devices to be installed for the appliances directly connected to domestic water. |
| 06/29/2009 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 06/29/2009 | DAVID RIVERA | ZONING | REVIEW | Approved | |
| 06/30/2009 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
| 06/30/2009 | CAGUILA1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | Electrical Plans incomplete---- Ray T Majuta DSD Elecxtrical Plan Ck 6/29/09 |
| 06/30/2009 | GERRY KOZIOL | WWM | REVIEW | Approved |