Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel11706183B
JurisdictionTucson
City of Tucson ZoningOCR-2
Tucson WardWard 6
Tucson Downtown Incentive ZoneDowntown Core, Downtown Infill Incentive District
Rio Nuevo DowntownRio Nuevo - Downtown
Rio Nuevo Multipurpose Facilities DistrictYes
Tucson Registered NeighborhoodDowntown
Major Streets & Routes

Gateway Route

RedevelopmentDowntown Redevelopment District
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Addresses

Annexations & Original City Zoning (OCZ)

Date - 11/22/2024 6:19 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Original Town Of Tucson ORIGINAL 08/07/1877 None

Special Development Requests & Requirements

Date - 11/22/2024 6:19 a.m.
Total Number Of Special Development Permits - (8)
Activity Number Status Apply Date Expired Date Type Description
H000000238 Closed N/A
T07SA00019 Expired N/A
T12SA00264 Complete N/A
T12SA00271 Withdrwn N/A
T12SA00277 Complete N/A
T13SA00077 Complete N/A
T14SA00326 Final N/A RNA HISTORIC
T20SA00076 Complete N/A ZONING LETTER

Permits

Parcel Number - 11706183B
Date - 11/22/2024 6:19 a.m.
Total Number Of Permits - (63)
Permit Permit Status Entered Date Expired Date Unit Type Description
T20OT00006 Expired 01/03/2020 07/01/2020 135 Sign - Permanent 1-ILLUM WALL SIGN
T20OT00236 Expired 03/13/2020 09/12/2020 159 Sign - Permanent 1- projecting illum sign
T21FC00220 Expired 03/22/2021 03/31/2022 Fire Construction Permit Fire Alarm & Detection Systems - MLK Building - Adding 3 modules for elevator modernization.; Fire Alarm Systems - Devices Modified: 3
TR-UTL-0423-01276 Complete 04/12/2023 06/07/2023 Right-of-Way (ROW) - Utility Railroad Repairs at the intersection of Main/ Granada and 5th st. with a full one day closure on 05/08/2023 with a detour route for both roads.
TZ-CMP-0424-00048 Complete 04/16/2024 N/A Zoning Compliance Zoning Verification Letter
DP16-0109 Issued 07/01/2016 02/27/2017 Development Package GRADING
T20OT00643 Issued 09/17/2020 03/16/2021 UNIT 159 Sign - Permanent 1= illum protruding sign
T18OT01058 Expired 10/05/2018 04/13/2019 159 Sign - Permanent 1-protruding illum sign
T19OT00965 Submitted 10/11/2019 N/A Sign - Permanent 1-ILLUM WALL SIGN
TF-FOP-1122-00156 Complete 11/29/2022 01/31/2023 Fire Operational Permit Trade show/ retail vendor event
T07AN00984 Issued 12/04/2007 N/A ADDRNEW
T08AN00924 Issued 10/23/2008 N/A ADDRNEW
T08BU00392 Final 02/28/2008 02/17/2009 BUILD FIRE ALARM
T08BU01310 Final 07/18/2008 06/07/2009 SPKLR Add 112 fire sprinklers
T08BU01398 Final 08/01/2008 02/09/2009 SPKLR Replace existing fire pump with new fire pump
T08BU01491 Final 08/13/2008 02/18/2009 SPKLR Add 6 fire sprinklers
T08CM02030 Final 06/11/2008 07/01/2009 COMBO TEMPORARY EXITING PLAN (COVERED CANOPY WALKWAY)
T08PL00560 Final 04/07/2008 03/10/2009 PLUMB NEW SEWER CONNECTION
T09AN00377 Issued 06/26/2009 N/A #159 ADDRNEW
T09AN00519 Issued 09/16/2009 N/A #101 ADDRNEW
T09AN00554 Issued 10/07/2009 N/A #123 ADDRNEW
T09BU01294 Final 08/28/2009 04/06/2010 #159 SPKLR Add 7 fire sprinklers
T09BU01644 Final 11/04/2009 06/01/2010 #135 SPKLR Add 2, relocate 1 fire sprinkler
T09BU01729 Final 11/18/2009 06/28/2010 #101 SPKLR Add 7 fire sprinklers
T09BU01730 Void 11/18/2009 N/A #101 SPKLR Add 7 fire sprinklers
T09CM01648 C of o 06/26/2009 07/20/2010 #159 COMBO JUICE & COFFEE SHOP
T09CM02532 C of o 09/17/2009 07/28/2010 #101 COMBO TI:YOGA STUDIO
T09CM02533 C of o 09/17/2009 07/20/2010 #135 COMBO TI:CRICKET STORE (RETAIL)
T09CM02699 C of o 10/07/2009 10/14/2010 #123 COMBO TI: RETAIL
T09OT02109 Final 10/01/2009 05/24/2010 #159 SIGN 17291 PROJECTING WALL SIGN OVERHANING IN RIGHT OF WAY PER AIR RIGHT CONVEYANCE PER MAYOR AND COUNCIL
T10BU00656 Final 04/21/2010 10/24/2010 #123 SPKLR Relocate 1 fire sprinkler
T10BU00684 Final 04/27/2010 12/13/2010 #101 SPKLR Relocate 3 fire sprinklers
T10CM01267 C of o 05/07/2010 12/21/2010 #101 COMBO TI:YOGA OASIS
T10OT00122 Final 01/19/2010 12/21/2010 #101 SIGN 17795
T10OT00202 Final 01/27/2010 10/31/2011 #135 SIGN 17841
T11BU00650 Final 05/17/2011 01/15/2012 #193 SPKLR RELOCATE 6 AND ADD 8 FIRE SPRINKLER HEADS.
T11CM00422 C of o 02/08/2011 01/24/2012 #193 COMBO TI: FIRST TENANT IN - RESTAURANT
T11CM00876 Final 03/24/2011 10/31/2011 #171 COMBO INSTALL:SEWER LINE:ADDITION:POUR FLOOR
T11CM02634 Final 08/22/2011 03/18/2012 #171 COMBO TI: SHELL
T11OT00996 Closed 05/19/2011 02/14/2012 #193 SIGN 2 BANNERS; 90 DAY, 05/19/11 - 08/17/11
T11OT01155 Expired 06/10/2011 12/11/2011 #193 SIGN 19678
T12OT00580 Final 04/11/2012 08/18/2013 #135 SIGN WALL SIGN ON EXSITING STRUCTURE 20406
T13BU00818 Final 07/03/2013 02/08/2014 #171 SPKLR RELOCATE 1 SPRINKLER
T13CM03356 Final 06/03/2013 10/04/2014 #171 COMBO TI: OFFICE
T14CM06518 C of o 10/01/2014 11/01/2015 #171 COMBO ICE CREAM PRODUCTION AND SALES
T14CM08839 Withdrwn 12/22/2014 N/A COMBO NEW 13 RELOCATE 1
T15CM05641 Final 08/13/2015 02/14/2016 #159 COMBO ELECTRICAL RECONNECT
T15CM08416 Final 11/30/2015 05/30/2016 #123 COMBO ELECTRIC RECONNECT
T15CM08506 C of o 12/04/2015 08/14/2016 #123 COMBO RETAIL
T15OT00510 Expired 04/16/2015 10/21/2015 #159 SIGN 1- ILLUM WALL SIGN / 1- ILLUM PROJECTING SIGN
T15OT01098 Expired 08/18/2015 N/A PEDDLER regulated peddler
T16BU00067 Final 01/15/2016 08/10/2016 #123 SPKLR SPRINKLER
T16OT00265 Expired 02/25/2016 10/01/2016 SIGN 1- ILLUM WALL SIGN / RNA-16-06 HPZ-16-19 APPROVED 3/23/16
T18RW03677 Final 08/15/2018 08/24/2018 ROW CHANGING OUT AIR CONDITIONING EQUIPMENT. CRANE WILL BE SET UP ON CONGRESS ST BETWEEN 5TH AVE AND ARIZONA AVE. ONSITE AT 3 AM AND WILL FINISH NO LATER THAN 6 AM.
T19CM06392 Final 09/03/2019 03/02/2020 #123 COMBO ELECTRICAL RECONNECT
T19CM07861 C of o 10/24/2019 04/26/2020 #115 COMBO RETAIL
T19OT01020 Final 10/24/2019 05/02/2020 SIGN 1- ILLUM PROJECTING WALL SIGN
T19RW00675 Final 02/06/2019 03/10/2019 ROW UNDERGROUND PULLBOX INSPECTION IN BRICK PAVERS NOTE: APPLICANT SHALL CONTACT STORE MANAGERS PRIOR TO JOB START TO COORDINATE BUSINESS ACCESS AT ALL TIMES
T20RW02042 Final 04/09/2020 06/19/2020 ROW INSTALLATION OF FIBER RELATED TO VERIZON SMALL CELLS: TUC OVERDRIVE 1 SC (T19RW01396 AND TUC OVERDRIVE 3 SC (T19RW01349) - @ 1175 LF Place vault on N side of Congress at approximately 180ft west of 5th Ave. From here drill, placing 3-1.25 conduits south 16ft then east 180ft then north 259ft then place a 5x5 manhole and continue NE to the north side of Toole Ave. From here it tees. 239ft to the SE then place a vault and NW 383ft then north 13ft to private property. THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. STOP WORK AND NOTIFY HPO IF ANY BURIED CULTURAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. SPECIAL NOTES Mobility Control Plan - Maintain pedestrian and bus access at all times. Field adjustments will be discussed during pre-construction meeting with Right-of-Way Inspector. RESTORATION Backfill- Backfill with CLSM slurry or aggregate base (AB). Asphalt Mix- Asphalt concrete shall be City of Tucson Mix No3 or COT Mix No2 with TR-22 Patch Limits- The limits of the paving shall be a minimum of 1-ft outside the excavation. Potholes spaced closely together and within 8-ft of each other will need to be joined together by one surface patch. Patches on streets identified as in no cut moratorium shall have a greater patch dimension extending to the nearest lane line and 50-ft on each side of the trench excavation limits. Striping- Replace/refresh all striping that is interrupted by patches. Landscape- Repair all landscaping disturbed. This includes irrigation, plantings, groundcover, and hardscape. Concrete- All concrete damaged or removed shall be replaced as a whole to the nearest joint. Stormwater - Good housekeeping measures shall be practiced during work and construction. 04/29/20 - PLAN CHANGE PER ATTACHED DRAWINGS (R/L CONFLICT ALONG NORTH 5TH AV BETWEEN EAST TOOLE AV AND EAST CONGRESS ST).
T20RW04833 Final 08/31/2020 01/31/2022 ROW APPROXIMATELY 156 STREET POLE BANNERS FOR DOWNTOWN REOPENING MARKETING CAMPAIGN IN PARTNERSHIP WITH PIMA COUNTY BACK-TO-BUSINESS INITIATIVE. PLEASE REFER TO MAP FOR STRETCHES OF STREET BANNERS WILL BE INSTALLED AND THE NUMBER OF POLES (BANNERS) ON EACH STRETCH. "WELCOME BACK" "READY FOR YOU" "HOLA - LISTO PARA SERVIR" "CLEAN & SAFE" WITH "DOWNTOWNTUCSON.ORG" AND DTP LOGO TO LEAD PEOPLE TO A LISTING OF OPEN BUSINESSES DOWNTOWN WHO HAVE BEEN CERTIFIED BY THE PC HEALTH DEPT. AS 'READY FOR YOU.' BANNERS TO BE INSTALLED BY DTP ON A SUNDAY/MONDAY EARLY MORNING 4AM-7AM. A SEPARATE TRACK ACCESS APPLICATION WILL BE SUBMITTED TO SUN LINK. POWER DOWN OF STREETCAR OCS LINE WILL BE REQUESTED FOR BANNERS BEING INSTALLED ON CONGRESS AND BROADWAY FOR TIME(S) AFTER THE STREETCAR IS NON-OPERATIONAL. RUSS STONE, MAINTENANCE AND SAFETY SUPERVISOR (520-940-0806) WILL PERFORM INSTALL WITH USE OF DTP BUCKET TRUCK. CITY OF TUCSON NOT RESPONSIBLE FOR REPLACEMENT OF BRACKETS NOR BANNERS MOUNTED ON ANY CITY LIGHT POLES DAMAGED OR REMOVED BY WEATHER OR VEHICLE MAINTAIN BANNERS IN GOOD CONDITION, CHECK AFTER SEVERE WEATHER. REPLACE AS NECESSARY WITH PERMISSION FROM TDOT. SHALL PROVIDE FLAGGERS, KEEP PEDESTRIAN WALKWAYS SAFE, INSTALL DURING NON BUSINESS HOURS AND REPAIR ANY DAMAGE THEY CAUSE SHALL COORDINATE WITH SUNLINK PRIOR TO STARTNG WORK CONGRESS BETWEEN 6TH AND 5TH AVE (10 BANNERS)
T20RW06048 Final 11/05/2020 02/17/2021 ROW SPEED FEEDBACK PROGRAM Temporarily placing speed trailer # 8694 in the ROW on northside of E Congress St. approx. 25 feet west of N 5th Ave, to capture volume data, as requested by Director.
T21RW04920 Final 11/04/2021 02/16/2022 ROW Commercial Painting: Front of apartment building. Boom lift required to reach height of building. Work along west side of N 5th Av, just north of intersection at N 5th Av and E Congress St. Complete sidewalk closure and closure of parking bump out. Notify Park Tucson (791-5071) for meter hooding in parking bump out east of work address. Track Access Permit may be required through SunLink Streetcar with the proximity of work to the Streetcar track and Overhead Caternary System. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. MAINTAIN PEDESTRIAN ACCESS 3. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 01/31/2022 - PERMIT RENEWED IN ORDER TO COMPLETE MURAL ON SIDE OF THE BUILDING. ONE NORTH FIFTH AND MURALIST ADDED TO PERMIT. UPON REVIEW, IT HAS BEEN DETERMINED THAT WORK WILL BE TAKING PLACE MORE THAT 25' FROM THE NEAREST OCS POLE. - R1
T22RW01584 Final 04/21/2022 09/06/2022 ROW SPEED TRAILERS 8695 AND 8696 WILL BE TEMPORARILY PLACED IN ROW TO CAPTURE SPEED/VOLUME DATA. TRAILER 8695 WILL BE PLACED ON CONGRESS W/OF N 5TH AV; AND TRAILER 8696 WILL BE PLACED ON BROADWAY E/OF CHURCH ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Code Enforcement

Parcel Number - 11706183B
Date - 11/22/2024 6:19 a.m.
Total Number Of Code Cases - 1
Case Number Case Status Entered Date Closed Date Unit Type Description
CE-VIO1222-00766 Closed - unfounded 12/01/2022 12/21/2022 Code Enforcement Case RMIN / Unit 215 2nd Floor / Leaking in kitchen sink causing water damaged to floor, dirty dusty air ducts