Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE
Permit Number - T09CM00795
Review Name: RESUBMITTAL - SITE
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/26/2009 | RONALD BROWN | ADA | REVIEW | Denied | 1. At Detail 1/SD-1: Provide another bollard at the 90 degree corner of the concrete header just at the West end of the most Southerly Detectable Warning. 2. At Detail 1/D-1: a. Detectable warnings set to far back from edge of PAAL. Reference your generic ramp detail /D-3 where it shows proper location of Detectable Warrning Strips at 6" from edge of PAAL; move finishes up along with Detectable Warning strip. b. Provide a return concrete header to the vertical curb separating the pavers. c. Place the last bollard at the return header corner right next to the end of the detectable warning. |
06/08/2009 | JASON GREEN | ENGINEERING | REVIEW | Approved | DATE: June 9, 2009 SUBJECT: 900 S Randolph Way Site/Grading/Building Plan & Floodplain Use Permit- 2nd Engineering Review TO: Justin Dykstra LOCATION: T14S R14E Sec16 Ward 6 REVIEWERS: Jason Green, CFM ACTIVITY: T09CM00795 (Site/Building Plan), T09BU00502 (Grading Plan) & T09OT00684 (Floodplain Use Permit) SUMMARY: Engineering Division of Development Services Department has received and reviewed the site plan (T09CM00795), Building Plan (T09CM00795), Grading Plan (T09BU00502), Floodplain Use Permit (T09OT00684), Drainage Statement (Olsson Associates, 06MAR09 revised 18MAY09), Geotechnical Engineering Report (Terracon, 03APR09) and Stormwater Pollution Prevention Plan (Olsson Associates, 13JAN09 revised 06APR09) for the above referenced property. Engineering Division recommends approval of the plan sets at this time. DRAINAGE STATEMENT COMMENTS: 1) Complied. 2) Complied. 3) Complied. 4) Complied. 5) Complied. 6) Complied. SITE PLAN COMMENTS: 7) Complied. 8) Complied. 9) Complied. 10) Complied. 11) Complied. 12) Complied. 13) Complied. 14) Complied. 15) Complied. 16) Complied. 17) Complied. 18) Complied. 19) Complied. 20) Complied. 21) Complied. 22) Complied. GRADING PLAN COMMENTS: 23) Complied. 24) Complied. 25) Complied. 26) Complied. 27) Complied. 28) Complied. 29) Complied. 30) Complied. 31) Complied. 32) Complied. 33) Complied. 34) Complied. FLOODPLAIN USE PERMIT COMMENTS: 35) Complied. BUILDING PLAN COMMENTS: 36) Complied. 37) Complied. GEOTECHNICAL COMMENTS: 38) Complied. STORMWATER POLLUTION PREVENTION PLAN: Complied. For questions, or to schedule an appointment, I can be reached at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division COT Development Services |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/12/2009 | DELMA ROBEY | OUT TO CUSTOMER | Completed |