Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T09CM00692
Parcel: 13711429H

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T09CM00692
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/28/2009 ERIC NEWCOMB ZONING HC SITE REVIEW Approved
05/28/2009 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
06/01/2009 BIANCA RAMIREZ ENGINEERING REVIEW Approved DATE: June 1, 2009
REVIEWERS: Bianca Ramirez, CFM
ACTIVITY: T09CM00692 (Building Plan)


SUMMARY: Engineering Division of Development Services Department has received the building plan (T09CM00692). Engineering Division does not recommend approval of the building plan application at this time. The following items need to be addressed:


BUILDING PLAN COMMENTS:

1) Engineering could not verify that the building plan was in compliance with the stamped approved Development Plan (D08-0044). Please submit two copies of the stamped approved Development Plan, landscape, and NPPO plans with the next building plan submittal.

2) Engineering will re-review the building plan on the next submittal to insure compliance with the approved and stamped Development Plan. Additional comments may be forthcoming.


GENERAL COMMENTS:

Please provide the building plan with a copy of the last approved Development Plan (D08-0044). Further comments may be generated upon resubmittal of the building plan review.

For questions or to schedule an appointment I can be reached at 837-4929.




Bianca Ramirez, CFM
Senior Engineer Associate
Engineering Division
COT Development Services
06/01/2009 GERRY KOZIOL WWM REVIEW Denied NEED TO SHOW LOCATION & METHOD OF CONNECTION TO PUBLIC SEWER
06/02/2009 STEVE SHIELDS ZONING REVIEW Approved
06/09/2009 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Revise the ASHRAE ventilation calculations to include an air distribution effectiveness value of 0.8 (ceiling supply, ceiling return, warm air greater than 15 degrees Fahrenheit above space temperature). Reference: Section 6.2.2.2, ASHRAE Standard 62.1-2004.
06/10/2009 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Show the location of the dry vent for the combination waste and vent system. Reference: Section 912.2, IPC 2006.
2. Clarify the waste connections for the 3-compartment sink (item 51); detail 4/P3 appears to show 3 direct connections in addition to the floor sink located beneath the sink. Reference: Section 802.1, IPC 2006.
3. Clarify the reason for supplying natural gas (199.9 CFH @ 55 Ft) to an electric water heater. Reference: Section 106.3.1, IPC 2006.
4. Clarify the water pressure calculations. The calculations show an assumed available pressure of 60 PSI but 70 PSI is used as the design pressure. Reference: Section 106.3.1, IPC 2006 and Section A1.1, UPC 2006.
5. Complete labeling of the pipe and fixtures on detail 5/P3, specifically the size of the branch piping to P1/P1A and P2/P2A and fixture P1 in room 112. Coordinate detail 5/P3 with the plumbing floor plan for the water supply to fixture 29. Reference: Section 106.3.1, IPC 2006.
6. Confirm that the specified water heater and the specified mop sink will fit in the available space. Reference: Section 501.4, IPC 2006.