Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING ALL
Permit Number - T09BU00284
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/31/2010 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 03/31/2010 Mountain Vail Estates, Part F, Lots 323 thru 338 and 346 thru 384 and Common Area "B" Grading Plan Comments: 1- The Geotechnical Report shall recommend the required setback from existing/proposed slopes whether they are created by a cut or a fill. Verify compliance with the Soils Report recommendation. 2- Provide construction and access easement to install part of Chevrolet Drive and use it for access on the adjacent property near Lots 379 and 323. Explain when and how the easement will be provided. 3- Is B-7 access ramp slope 12:1 or 18:1? Revise as needed. SWPPP Comments: 1. Show on the SWPPP exhibit possible locations for on-site waste storage or receptacles, borrow areas, or other supporting activities (Part III.C.3.e). If you have any questions, Laith Alshami may be reached at 837-4933 or Laith.Alshami@tucsonaz.gov |
04/05/2010 | ANDREW CONNOR | ZONING | REVIEW | Denied | 03/30/2010 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan at this time. 2. While zoning acknowledges that the grading plan is in substantial zoning compliance as it relates to the Zoning review purview, with the approved version of the tentative plat, the grading plan cannot be approved at this time. Prior to Zoning approval the Engineering and Landscape Sections must approve the grading plan. |
04/05/2010 | ANDREW CONNOR | NPPO | REVIEW | Denied | Ensure that all Engineering comments and concerns are addressed prior NPP / Landscape approval stamp. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/07/2010 | CPIERCE1 | OUT TO CUSTOMER | Completed |
04/07/2010 | SUE REEVES | REJECT SHELF | Completed |